Laserfiche WebLink
Section 5. Projected Demand Requirements — 2019 to 2033 <br /> This section discusses MMPA's historical and future demand <br /> requirements. This IRP examines both MMPA's Non-Coincident <br /> Peak(NCP) demand requirements and MMPA's Coincident Peak <br /> (CP) demand requirements with MISO. In accordance with <br /> Department of Commerce (DOC) instruction and in compliance <br /> with MISO, MMPA uses its CP demand requirements for planning <br /> purposes in this IRP. <br /> Historical 1.4% Over the period 2004 to 2017, MMPA member NCP demand <br /> NCP Demand requirements grew at a compound annual growth rate of <br /> Growth Rate approximately 1.4% for all twelve MMPA members. <br /> The following graph shows historical MMPA member NCP demand <br /> requirements for the years 2004 to 2017, the time period for which <br /> data is available for all twelve member cities. MMPA only served a <br /> portion of Shakopee's load until 2009. Therefore, the data has been <br /> adjusted to include all of Shakopee's load. MMPA has not <br /> historically served Elk River, but the data has been adjusted to <br /> include this load. <br /> The demands recognize a 2.3% transmission loss factor, and an <br /> 8.4% planning reserve margin. Actual planning reserve <br /> requirements have varied from 2004-2017, but for consistency <br /> across historic years, this IRP assumes 8.4%for all periods. <br /> Minnesota Municipal Power Agency <br /> Historical Member NCP Demand (MW) <br /> 600 <br /> 500 <br /> 400 <br /> 300 <br /> 200 <br /> 100 <br /> 0 <br /> 64) 6'e 6 >yczq s' \b <br /> n0 0 ^ ^, <br /> 87 <br />