My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2003
>
07-22-2003
>
Item 3.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 12:45:17 PM
Creation date
7/23/2018 12:45:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDA Special Meeting Page 2 <br /> January 6, 1997 <br /> • Terry provided a map indicating the proposed transportation and utility corridor <br /> for the eastern area of the city, running south from the intersection of County <br /> Road No. 12 and 13 to 171st and crossing Highway 10. Terry explained the logic <br /> behind the proposed route, noting criteria such as topography, wetlands, existing <br /> roadways, zoning, etc. Terry noted that this transportation corridor ties in with the <br /> draft transpiration plan which has been in existence for approximately 5 years. <br /> 4. Proposed Industrial Site Opportunities - Steve Ach <br /> Steve pointed out the 8 areas identified as potential industrial sites. Staff chose <br /> these sites based on the criteria explained by Paul, and noted that all eight sites <br /> are within the urban service area. Steve explained that Areas 3, 5, 6 and 7 were <br /> identified largely because of their proximity to the proposed transportation/utility <br /> corridor. <br /> Discussion followed regarding the 8 areas identified by staff for possible industrial <br /> development: <br /> Area 1 (Wilson property) - Approximately 65 acres located north of County Road <br /> 30, between Waco and the Sandpiper Estates 2nd Addition <br /> Area 2 (Outlot A, Brentwood) -Approximately 17 acres located west of Highway <br /> 169, east of Irving Street and south of 197th <br /> Area 3- Approximately 33 acres located east of County Road 13 and north of <br /> IIICounty Road 12 <br /> Area 4 - (Hohlen property) - Approximately 8 acres located west of Highway 169 <br /> south of Main Street <br /> Area 5- Approximately 25 acres located east of Highway 169 and south of the <br /> existing Elk Terrace Mobile Home Park <br /> Area 6 - Approximately 18 acres located east of Highway 169 and north of the <br /> 177th Avenue alignment <br /> Area 7 -Approximately 85 acres along east Highway 10, south of the 177th <br /> Avenue alignment and west of Tyler Street alignment <br /> Area 8- 190 acres lying between east Highway 10 and the Mississippi River, <br /> located south of the 167th Avenue alignment and north of the Oliver Kelley Farm <br /> Steve noted that Area 8 property is currently zoned residential, and has access to <br /> Highway 10. This parcel could provide a large contiguous industrial/business park. <br /> River frontage could possibly be developed as residential. <br /> Discussion followed regarding each of the 8 areas. Commissioner Duitsman felt <br /> Areas 1, 6, 7 and 3 would most likely be developed first. Area 8 appeared to fall <br /> in the "long range" planning scenario. Commissioner Holmgren was concerned <br /> an industrial user in Area 1 would face traffic issues getting through Elk River and <br /> 111 felt the best use for that area would be residential. <br />
The URL can be used to link to this page
Your browser does not support the video tag.