My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.4. SR 07-23-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
07-23-2018 SPECIAL
>
3.4. SR 07-23-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 10:36:49 AM
Creation date
7/20/2018 11:31:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUNICIPAL - 40 UNIT APARTMENT ELK RIVER <br />ELK RIVER, MN <br />BLD1807-00030 <br />7/11/2018 Page 24 <br /> <br /> <br />This information can be provided to you in alternative formats (Braille, large print or audio). <br />An Equal Opportunity Employer <br /> <br /> <br />Energy Code Comments: <br /> <br />1. Building Certificate. <br />A completed building certificate is required before a Certificate of Occupancy can be issued. <br />Please address. <br /> <br /> Certificate (Mandatory). A building certificate shall be completed and posted on or in <br />the electrical distribution panel by the builder or registered design professional. The <br />certificate shall not cover or obstruct the visibility of the circuit directory label, service <br />disconnect label, or other required labels. The certificate shall list: the date the certificate <br />is installed; the dwelling address; residential contractor name and contractor license <br />number, or homeowner name, if acting as the general contractor; the predominant <br />installed R-values, their location, and type of insulation installed in or on ceiling/roof, <br />walls, rim/band joist, foundation, slab, basement wall, crawl space wall or floor, and <br />ducts outside conditioned spaces; U-factors for fenestration and the solar heat gain <br />coefficient (SHGC) of fenestration; and the results of any required duct system and <br />building envelope air leakage testing done on the building. Where there is more than one <br />value for each component, the certificate shall list the value covering the largest area. <br />The certificate shall list the types, input ratings, manufacturers, model numbers and <br />efficiencies of heating, cooling, and service water heating equipment. The certificate <br />shall also list the structure's calculated heat loss, calculated cooling load, and calculated <br />heat gain. Where an electric furnace or baseboard electric heater is installed in the <br />residence, the certificate shall list “electric furnace” or “baseboard electric heater,” as <br />appropriate. An efficiency shall not be listed for electric furnaces or electric baseboard <br />heaters. The certificate shall list the mechanical ventilation system type, location, and <br />capacity, and the building's designated continuous and total ventilation rates. The <br />certificate shall also list the type, size, and location of any make-up air system installed <br />and the location or future location of the radon fan. [MR 1322.0401.3] <br /> <br />2. Blower Door Test. <br />Every new residential building or dwelling unit is required to pass a blower door test. <br />Documentation of the test is required to be submitted to the AHJ for Inspections (City of Elk <br />River), reviewed and approved before the issuance of a Certificate of Occupancy. Please <br />address. <br /> <br /> Testing. The building or dwelling unit shall be tested and verified as having an air <br />leakage rate of not exceeding 5 air changes per hour in Climate Zones 1 and 2, and 3 air <br />changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower <br />door at a pressure of 0.2 inches w.g. Where required by the code official, testing shall be <br />conducted by an approved third party. A written report of the results of the test shall be <br />signed by the party conducting the test and provided to the code official. Testing shall be
The URL can be used to link to this page
Your browser does not support the video tag.