Laserfiche WebLink
111 Mr. Scott Harlicker <br /> January 21, 2002 <br /> Page Two <br /> • There is only one access from the proposed plat onto Tyler Street. That is at the <br /> northern portion of the development. The access point lines up with the northern <br /> access from Elk River Business Park. Left turn lanes for turning vehicles into Trott <br /> Brook Crossing are established at this point. <br /> The southerly access from Elk River Business Park also has left turn lanes <br /> established for access into Trott Brook Crossing. However, the Developer has <br /> indicated that the gas line easement and the elevation of Tyler Street make it <br /> impossible to have a road connection at this point. Therefore, the Developer has <br /> shown an emergency access from the cul-de-sac to Tyler Street. This must be <br /> paved to a width of 10 feet so that it can act as a pedestrian trail. We will work with <br /> the Developer's engineer to design an emergency access that is suitable for the <br /> largest emergency vehicles that may need to use it. At a minimum, the width needed <br /> for emergency vehicles is 20 feet. <br /> • The left turn lane on Tyler Street at this southerly access point will need to be <br /> removed by this development. <br /> • The townhome ordinance requires a 30-foot setback from the curb line on private <br /> drives to the buildings. The 8-plexes at the northwest corner of this development do <br /> not currently meet this setback. The building arrangements will need to be adjusted <br /> ID to maintain a minimum of 30 feet from the curb line on the private drives to the <br /> buildings. <br /> C. GRADING, DRAINAGE, AND EROSION CONTROL PLAN <br /> • Where Street C hits the south plat boundary as it would enter into the Brown property <br /> further to the south, it appears to be at a poor location. From the little bit of <br /> topography shown, it appears that the street location will fall on the side of a hill <br /> located on the Brown property. Additional information needs to be provided to <br /> definitively show that this street location will not cause development problems on the <br /> Brown property. If it will cause development difficulty on the Brown property, the <br /> location where Street C hits the south plat boundary needs to be modified. <br /> • Additional storm sewer structures need to be placed in Street E to catch runoff from <br /> the 8-plexes prior to discharging into Street E. It appears the proposed storm sewer <br /> route can be adjusted to hit Street E with appropriately placed catch basins. <br /> • We question whether or not a permit from the gas company can be obtained for the <br /> storm sewer line from Street D to Street E. The storm sewer line is shown on the <br /> gas line easement boundary. Therefore, construction of this line would require <br /> digging in the gas line easement parallel to the gas line. <br /> • It appears that the driveway for Unit 11 and for 8-plex building #2 are somewhat flat. <br /> These two areas should be looked at and building elevations adjusted as <br /> appropriate. <br /> • There are a number of areas where cross-lot drainage will not follow the prescribed <br /> • drainage and utility easements. In these cases, additional drainage and utility <br /> easements will need to be provided to accommodate these drainage patterns. <br /> Howarc R. Green Company <br /> Ltr 1-21-02 Harlicker.rev CONSULTING ENGINEERS <br />