• Mr. Scott Harlicker <br /> January 21, 2002 <br /> Page Three <br /> • The emergency overflow and high water elevations need to be included on the plan <br /> to verify the elevation of the buildings. <br /> • At the southeast corner of the plat, there are two areas where storm sewer pipe <br /> extends out into the rear lot areas to pick up low points. We question whether or not <br /> these storm sewer extensions are necessary. Closer examination of the natural <br /> topography in these areas should take place to verify whether or not storm sewer is <br /> necessary to pick up these isolated drainage areas. <br /> • There is grading shown on the exception to the plat all along the frontage of Street C. <br /> Permission from the owner of the exception will be necessary before the grading <br /> plan can be approved. <br /> • A temporary cul-de-sac meeting the City dimensions will need to be constructed at <br /> the south end of Street C. If the Developer is unable to get an easement from the <br /> Brown property to construct a temporary cul-de-sac, one of the lots in this location <br /> may become unbuildable to facilitate the cul-de-sac construction. <br /> • When the grading plan is resubmitted with the above changes and/or corrections, it <br /> should be submitted at a 50 scale. <br /> D. PRELIMINARY UTILITY PLAN <br /> • ■ The dead-end watermain proposed in Street D and Street E needs to be looped <br /> together to eliminate the dead-ends and to facilitate a higher fire flow in these areas. <br /> • Sanitary sewer and water services should be shown at the appropriate locations for <br /> serving future lots to be developed in the exception. Also, an extension of the <br /> mainline water and sewer, if appropriate, needs to be shown into the exception. <br /> • We are reviewing the ERMU's water model to determine an appropriate routing and <br /> sizing for a trunk watermain through this development. We will provide this <br /> information as soon as it is available. This development will be provided a trunk <br /> credit for any trunk sized watermain required above 8-inch. <br /> E. STORM DRAINAGE CALCULATIONS <br /> • A review of the storm drainage calculations submitted indicates that the calculations <br /> are for Trott Brook Farms South and Trott Brook Crossing. When the two plats are <br /> looked at for storm drainage purposes together, the drainage calculations are <br /> acceptable. Essentially, the drainage calculations are requiring Trott Brook Crossing <br /> to retain more of its drainage so that Trott Brook Farms South can discharge at a <br /> slightly higher rate than proposed. At some point, the Developers of Trott Brook <br /> Crossing will need to submit in writing that they are agreeable to restricting the <br /> discharge from their site to a lower level so that Trott Brook Farms South can <br /> discharge at a higher rate. <br /> • <br /> Howard R. Green Company <br /> Ltr 1-21-02 Harlicker.rev CONSULTING ENGINEERS <br />