My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
04-22-1997
>
5.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 4:27:06 PM
Creation date
4/13/2018 1:10:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to the Planning Commission/CU 97-10 Page 4 <br /> April 22, 1997 <br /> • previous conditional use permit approval, a landscaping plan had been <br /> approved. The applicants did install sod along with underground irrigation <br /> throughout the site; however, they have not yet completed all of their <br /> landscaping installation. <br /> Septic and Well <br /> The subject property was originally owned by the same property owner of the <br /> Bridgeman's site. At that time, the septic system to serve the Bridgeman's <br /> facility was constructed on the subject property. The septic location is in the <br /> northwest corner of the site and covers an area of approximately 125' by 37' <br /> wide. Sometime before or after the septic system was installed, a 20 foot <br /> wide drainfield easement was established over this property. However, this <br /> 20 foot wide easement does not cover the actual location of the drainfield. It <br /> is recommended the appropriate easement be established to cover the area of <br /> the existing drainfield and to clean up this existing condition. The easement <br /> would be between the two property owners and not involve the city. <br /> The proposed plans do not show the location of the new septic field to serve <br /> the proposed building. The contractor has indicated that the septic field <br /> would be built adjacent to the existing field that extends onto this property <br /> from the Bridgeman's site. Staff is concerned with the area that is actually <br /> • left on site to construct a septic system and drainfield. A portion of the <br /> proposed drainfield area is currently a parking lot which cannot be utilized <br /> for a drainfield. <br /> In addition, with the development of the proposed building, this site will no <br /> longer have a "secondary drainfield" system. Staff is concerned with the <br /> intensity this site is being developed in an unserviced area. Residential <br /> developments are required to demonstrate a primary and secondary <br /> drainfield. This same standard should apply to commercial and industrial in <br /> unserviced areas. Even though this property is within the urban service <br /> area, there is no guaranteed time frame when city water and sewer will be <br /> made available. <br /> Outdoor Storage/Trash Enclosure <br /> The site currently has an outdoor storage area used for vehicles waiting to be <br /> serviced. Originally, this area was to be used for storage of approximately 4 <br /> vehicles. The amount of storage seems to have increased since the building <br /> has been occupied. Since outdoor storage is not allowed in the commercial <br /> area, staff would suggest the area utilized for inoperable vehicles be <br /> minimized. Furthermore, the revised plans should indicate a trash enclosure <br /> • <br /> f:\shrdoc\planning\pc\cu97-10.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.