Laserfiche WebLink
First National Bank Page 4 <br /> September 27, 1994 <br /> • <br /> D. Signage <br /> 1. At this time, the Bank is proposing to utilize wall signage <br /> on the building and drive through canopy. Free standing <br /> signage is allowed and may be installed upon receiving a <br /> sign permit. All signage will need to be provided in <br /> conformance with the Elk Park Center Sign <br /> Requirements, as outlined in the PUD Agreement. <br /> E. Building and Elevations <br /> 1. The building is proposed to be constructed with a <br /> combination of brick, masonry, and a pre-finished copper <br /> standing seam metal roof. These materials are consistent <br /> with both the main shopping center and the Wendy's <br /> facility directly to the north. <br /> F. Drainage and Utilities <br /> . 1. Issues outlined in Terry Maurer's memo will need to be <br /> incorporated and made part of the final plans before <br /> issuance of building permit. <br /> RECOMMENDATION <br /> It is recommended the Planning Commission recommend approval of <br /> the conditional use permit request for site plan review by First <br /> National Bank of Elk River to construct a 3,300 square foot bank <br /> facility with the following conditions: <br /> 1. ALL COMMENTS MENTIONED IN THIS MEMO BE <br /> INCORPORATED INTO THE REVISED PLANS AND <br /> SUBMITTED FOR FINAL REVIEW PRIOR TO ISSUANCE OF <br /> BUILDING PERMIT. <br /> 2. TERRY MAURER'S COMMENTS OUTLINED IN A MEMO <br /> DATED SEPTEMBER 22, 1994, BE INCLUDED IN THE <br /> REVISED PLANS. <br /> 3. THE "EXIT ONLY" DRIVE MAY BE DESIGNED AND <br /> CONTINUE TO OPERATE WITH LEFT AND RIGHT TURNING <br /> MOVEMENTS. HOWEVER, IF IN THE FUTURE INTERNAL <br /> • STACKING PROBLEMS OR TURNING CONFLICTS OCCUR <br /> ON FREEPORT, THE DRIVEWAY WILL NEED TO BE <br /> RECONSTRUCTED TO ALLOW RIGHT TURN OUTS ONLY. <br /> firstban.pc <br />