Laserfiche WebLink
First National Bank Page 3 <br /> September 27, 1994 <br /> • <br /> landscape plan and incorporated into the overall plan for <br /> the bank facility. <br /> 2. Also, boulevard trees are being installed along Freeport <br /> Avenue and 191st as part of the Elk Park Center <br /> development. These should also be shown on the <br /> landscape plan and incorporated with the proposed <br /> landscaping on site. <br /> 3. The size of landscaping material should be indicated on <br /> the plans. Minimum sizes are as follows: <br /> • Overstory trees: 2" caliper, b & b <br /> • Ornamental trees: 1" caliper, b & b <br /> • Conifer trees: 6 feet high <br /> • Shrubs: may vary in size <br /> 4. Some of the conifers located along the south property line <br /> should be distributed throughout the site to balance <br /> landscaping for year round interest. For example, some <br /> • conifers could be shifted to the north and along the east. <br /> 5. It is recommended that some medium sized evergreen <br /> shrubs be included along Highway 169 to soften the <br /> visual appearance of the large drive-up area. <br /> 6. An earth berm within the northerly landscaped area will <br /> assist in reducing vehicle headlights from shining into the <br /> traffic on 191st Avenue. The plans presently show a berm <br /> and landscaping that will provide a nice buffer between a <br /> drive-up area and 191st Avenue. <br /> 7. Seed may be utilized within the long range expansion <br /> area. Otherwise, sod should be installed throughout all <br /> disturbed areas unless noted on the plans. <br /> 8. Erosion control (i.e., silk fence) should be used during <br /> construction in those areas where appropriate. This <br /> detail should be reflected on revised plans. <br /> 9. Underground irrigation throughout all landscaped areas <br /> • are required as part of the Elk Park Center PUD <br /> (Planned Unit Development). <br /> firstban.pc <br />