Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> TABLE 5A <br /> Metering, Monitoring and Control Requirements <br /> Generation System Generation <br /> Generation Remote <br /> Capacity at Point of Metering Monitoring Remote <br /> Common Coupling Control <br /> <_40 kW with all sales to Bi-Directional metering at the point None Required None Required <br /> Area EPS of common coupling <br /> >40 kW Determined by engineering study Determined by Determined by <br /> engineering study engineering <br /> study <br /> Interconnection Process for Distributed Generat4viSystems <br />