Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> 5. Generation Metering, Monitoring and Control <br /> Metering, Monitoring and Control— Depending upon the method of interconnection and the size of the <br /> Generation System, there are different metering, monitoring and control requirements Table 5A is a <br /> table summarizing the metering, monitoring and control requirements. <br /> Due to the variation in Generation Systems and Area EPS operational needs, the requirements for <br /> metering, monitoring and control listed in this document are the expected maximum requirements that <br /> the Area EPS will apply to the Generation System. It is important to note that for some Generation <br /> System installations the Area EPS may wave some of the requirements of this section if they are not <br /> needed. An example of this is with rural or low capacity feeders which require more monitoring then <br /> larger capacity, typically urban feeders. <br /> Another factor which will affect the metering, monitoring and control requirements will be the tariff <br /> under which the Interconnection Customer is supplied by the Area EPS. Table 5A has been written to <br /> cover most application, but some Area EPS tariffs may have greater or less metering, monitoring and <br /> control requirements then, as shown in Table 5A. . <br /> Interconnection Process for Distributed GeneratooSystems <br />