My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> • Grounding Reviews <br /> - Does the proposed grounding system for the Generation System meet the requirements of <br /> the NESC? "National Electrical Safety Code" published by the Institute of Electrical <br /> and Electronics Engineers(IEEE) <br /> • System Operation Impact. <br /> - Are special operating procedures needed with the addition of the generation? <br /> - Reclosing and out of sync operation of facilities. <br /> - What limitations need to be placed on the operation of the generation? <br /> - Operational Var requirements? <br /> Interconnection Process for Distributed Generate Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.