Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> • Grounding Reviews <br /> - Does the proposed grounding system for the Generation System meet the requirements of <br /> the NESC? "National Electrical Safety Code" published by the Institute of Electrical <br /> and Electronics Engineers(IEEE) <br /> • System Operation Impact. <br /> - Are special operating procedures needed with the addition of the generation? <br /> - Reclosing and out of sync operation of facilities. <br /> - What limitations need to be placed on the operation of the generation? <br /> - Operational Var requirements? <br /> Interconnection Process for Distributed Generate Systems <br />