My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> STATE OF MINNESOTA <br /> DISTRIBUTED GENERATION INTERCONNECTION <br /> REQUIREMENTS <br /> TABLE OF CONTENTS <br /> Foreword 2 <br /> 1. Introduction 3 <br /> 2. References 6 <br /> 3. Types of Interconnections 7 <br /> 4. Interconnection Issues and Technical Requirements 10 <br /> 5. Generation Metering, Monitoring and Control 13 <br /> Table 5A— Metering, Monitoring and Control Requirements 14 <br /> 6. Protective Devices and Systems 17 <br /> Table 6A— Relay Requirements 19 <br /> 7. Agreements 20 <br /> 8. Testing Requirements 21 <br /> Attachments: System Diagrams <br /> Figure 1 —Open Transition 25 <br /> Figure 2—Closed Transition 26 <br /> Figure 3—Soft Loading Transfer <br /> With Limited Parallel Operation 27 <br /> Figure 4—Soft Loading Transfer <br /> With Limited Parallel Operation 28 <br /> Figure 5— Extended Parallel <br /> With Transfer-Trip 29 <br /> Interconnection Process for Distributed General.;i Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.