Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> STATE OF MINNESOTA <br /> DISTRIBUTED GENERATION INTERCONNECTION <br /> REQUIREMENTS <br /> TABLE OF CONTENTS <br /> Foreword 2 <br /> 1. Introduction 3 <br /> 2. References 6 <br /> 3. Types of Interconnections 7 <br /> 4. Interconnection Issues and Technical Requirements 10 <br /> 5. Generation Metering, Monitoring and Control 13 <br /> Table 5A— Metering, Monitoring and Control Requirements 14 <br /> 6. Protective Devices and Systems 17 <br /> Table 6A— Relay Requirements 19 <br /> 7. Agreements 20 <br /> 8. Testing Requirements 21 <br /> Attachments: System Diagrams <br /> Figure 1 —Open Transition 25 <br /> Figure 2—Closed Transition 26 <br /> Figure 3—Soft Loading Transfer <br /> With Limited Parallel Operation 27 <br /> Figure 4—Soft Loading Transfer <br /> With Limited Parallel Operation 28 <br /> Figure 5— Extended Parallel <br /> With Transfer-Trip 29 <br /> Interconnection Process for Distributed General.;i Systems <br />