My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> Process for Interconnection <br /> Step 1 Application (By Applicant) <br /> Once a decision has been made by the Applicant, that they would like to interconnect a <br /> Generation System with the Area EPS, the Applicant shall supply the Area EPS with the following <br /> information: <br /> 1) Completed Generation Interconnection Application (Appendix C),including; <br /> a) One-line diagram showing; <br /> i) Protective relaying. <br /> ii) Point of Common Coupling. <br /> b) Site plan of the proposed installation. <br /> c) Name plate capacity of proposed generation system. <br /> d) Estimate of annual energy production from proposed generation system. <br /> e) Proposed schedule of the installation. <br /> 2) Payment of the application fee,according to the following sliding scale. <br /> Generation Interconnection Application Fees: $200 <br /> This application fee is to contribute to the Area EPS Operator's labor costs for administration, <br /> review of the design concept and preliminary engineering screening for the proposed Generation <br /> System interconnection. <br /> Step 2 Preliminary Review (By Area EPS) <br /> Within 15 business days of receipt of all the information listed in Step 1, the Area EPS Generation <br /> Interconnection Coordinator shall respond to the Applicant with the information listed below. (If <br /> the information required in Step 1 is not complete, the Applicant will be notified, within 10 <br /> business days of what is missing and no further review will be completed until the missing <br /> information is submitted. The 15-day clock will restart with the new submittal) <br /> As part of Step 2 the proposed Generation System will be screened to see if additional <br /> Engineering Studies are required. The base screening criteria is listed in the general information <br /> section of this document. <br /> Interconnection Process for Distributed Generati 4 Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.