My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> 1) A single point of contact with the Area EPS Operator for this project.(Generation <br /> Interconnection Coordinator) <br /> 2) Approval or rejection of the generation interconnection request. <br /> a) Rejection—The Area EPS shall supply the technical reasons,with supporting <br /> information,for rejection of the interconnection Application. <br /> b) Approval-An approved Application is valid for 6 months from the date of the <br /> approval.The Area EPS Generation Interconnection Coordinator may extend this <br /> time if requested by the Applicant <br /> 3) If additional specialized engineering studies are required for the proposed interconnection, <br /> the following information will be provided to the Applicant.Typical Engineering Studies are <br /> outlined in Appendix D.The costs to the Applicant,for these studies shall be not exceed the <br /> values shown in the following table for pre-certified equipment. <br /> Generation System Size Engineering Study <br /> Maximum Costs <br /> <_40kW Actual Costs <br /> >40kW Actual Costs <br /> a) General scope of the engineering studies required. <br /> b) Estimated cost of the engineering studies. <br /> c) Estimated duration of the engineering studies. <br /> d) Additional information required to allow the completion of the engineering <br /> studies. <br /> e) Study authorization agreement. <br /> 4) Comments on the schedule provided. <br /> 5) If the rules of MISO(Midwest Independent System Operator)require that this <br /> interconnection request be processed through the MISO process,the Generation <br /> Interconnection Coordinator will notify the Applicant that the generation system isnot <br /> eligible for review through the State of Minnesota process. <br /> Step 3 Go-No Go Decision for Engineering Studies (By Applicant) <br /> In this step, the Applicant will decide whether or not to proceed with the required engineering <br /> studies for the proposed generation interconnection. If no specialized engineering studies are <br /> required by the Area EPS Operator, the Area EPS Operator and the Applicant will automatically <br /> skip this step. <br /> If the Applicant decides NOT to proceed with the engineering studies, the Applicant shall notify <br /> the Area EPS Generation Interconnection Coordinator, so other generation interconnection <br /> requests in the queue are not adversely impacted. Should the Applicant decide to proceed, the <br /> Applicant shall provide the following to the Area EPS Generation Interconnection Coordinator: <br /> 1) Payment required by the Area EPS Operator for the specialized engineeringstudies. <br /> 2) Additional information requested by the Area EPS Operator to allow completion of the <br /> engineering studies. <br /> Interconnection Process for Distributed Generatiy5 Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.