Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> J) Required Documents <br /> The chart below lists the documents required for each type and size of Generation <br /> System proposed for interconnection. <br /> Find your type of Generation System interconnection, across the top, then follow the <br /> chart straight down, to determine what documents are required as part of the <br /> interconnection process. <br /> Interconnection Process (This document) <br /> State of Minnesota Distributed Generation Interconnection Requirements <br /> Generation Interconnection Application (Appendix B) <br /> Engineering Data Submittal (Appendix C) <br /> Om Interconnection Agreement <br /> (Appendix E) <br /> it MISO/FERC <br /> :AA � �.� PPA <br /> Interconnection Process ="State of Minnesota Interconnection Process for Distributed <br /> Generation Systems." (This document) <br /> State of Minnesota Distributed Generation Interconnection Requirements ="State of Minnesota <br /> Distributed Generation Interconnection Requirements" <br /> Generation Interconnection Application =The application form in Appendix B of this document. <br /> Engineering Data Submittal =The Engineering Data Form/Agreement, which is attached as <br /> Appendix C of this document. <br /> Interconnection Agreement="Minnesota State Interconnection Agreement for the <br /> Interconnection of Extended Parallel Distributed Generation Systems with Electric Utilities." <br /> MISO. = Midwest Independent System Operator, www.midwestiso.orq <br /> FERC = Federal Energy Regulatory Commission, www.ferc.qov <br /> PPA= Power Purchase Agreement. <br /> Interconnection Process for Distributed Generati 3 Systems <br />