My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 07-19-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
07/19/1999
>
4.3. SR 07-19-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:20 AM
Creation date
3/3/2005 3:59:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/19/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />c. <br /> <br />A motion was made by Duane Grandy, seconded by Jerry Goebel and <br />carried unanimously to approve the recommendation of the Executive <br />Committee that the Joint Powers Agreement not be amended at this time <br />and that the Ramsey County Regional Railroad Authority (RCRRA) be <br />welcomed to attend NCDA meetings to facilitate the exchange of <br />information and coordination. <br /> <br />. <br /> <br />4. Commissioners Erhart and Wergin, Stephanie Eiler, Tim Yantos, and Mary <br />Richardson reported on the APT A Commuter Rail Conference, which was <br />recently held in Toronto. <br /> <br />5. <br /> <br />Mary Richardson provided a wrap-up of the 1999 legislative session. Mn/DOT <br />must adopt a commuter rail system plan by January 15,2000. The plan is to <br />incorporate elements of existing Regional Railroad Authorities' (RRA's) plans <br />and engineering standards (rail equipment, facilities, services including security, <br />station design parameters, farebox systems, and safety). The system plan will be <br />done in consultation with the RRA's. Both the system plan and the advanced <br />corridor plan require MPO approval. A Commuter Rail Corridor Coordinating <br />Committee must be established to advise the Commissioner of Transportation on <br />alternative analysis, environmental review, advanced corridor planning, PE, FD, <br />implementation method, construction, public involvement, land use, service and <br />safety. In the Northstar Corridor, the NCDA will serve as the Coordinating <br />Committee. RRA's will be required to enter into a memorandum of <br />understanding with MnlDOT. <br /> <br />. <br /> <br />Sixty million dollars ($60 ml) in bonding authority was authorized for the <br />Hiawatha LR T system. <br /> <br />6. The Authority reviewed a letter directed to D.J. Mitchell, Burlington Northern <br />Santa Fe (BNSF), from Mr. Tim Yantos, requesting an acknowledgement from <br />BNSF that the NCDA expects to commence commuter rail service in the <br />Northstar Corridor in 2003, utilizing the existing BNSF right-of-way, freight <br />tracks, and facilities and requests assistance from BNSF in accomplishing its goal <br />of providing convenient, reliable, efficient and cost effective commuter rail <br />service. Mr. Yantos presented the response from BNSF. <br /> <br />7. The Authority reviewed the draft principles for station area location and planning <br />presented by Ken Stevens. <br /> <br />A motion was made by Pat Cairns, seconded by Lewis Stark and carried <br />unanimously to add the word "safely" in the first bullet under Community <br />Integration, A. Access, to read as follows: "Provide access on a public street <br />system that safely accommodates added traffic demands generated by the <br />facility. " <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.