My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 07-19-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
07/19/1999
>
4.3. SR 07-19-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:20 AM
Creation date
3/3/2005 3:59:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/19/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> Anoka County Pro yrammed Transportation Improvements for F.Y. 1999-2002 . <br />Implementation Facility or Route Project Description <br />A2enCy <br />MnlDOT / Anoka County TH 10 Traffic signal revision and improvements at <br /> Hanson Boulevard ramp <br /> Reconstruct and widen CSAH 78 (Hanson <br />Anoka County CSAH 78 Blvd.) from Coon Rapids Blvd. to Robinson <br /> Drive <br />Mn/DOT Sunfish Lake Rd. @ Install high type surface <br />BNSF - Ramsey <br />MnlDOT TH 169 Mississippi River to TH 10 10 Anoka - <br /> Reconstruct, widen, etc. <br />Anoka County CSAH 14 CSAH 9 to TH 10 widening to 6 lanes, adding <br /> signals <br />Anoka County CSAH 11 Addition of left turns lanes at Egret <br /> intersection <br />Mn/DOT TH47 Northeast ramp terminal at 1-694 ramp <br /> widening and signal revision <br />Mn/DOT TH 610 Proposed ramp from Foley Park-and-Ride to <br /> TH 252 <br />Source: Anoka County 2015 Transportation Plan; Anoka County Five Year Highway Improvement Plan for 1999-2003; State <br /> Transportation Improvement Program (STIP) 1999-2001; Metropolitan Development Guide. <br />Hennepin County / Metropolitan Area . <br />Congestion in the Twin Cities metropolitan area is expected to increase over the next 25 years as <br />new residents, jobs and households are added to the relatively unchanging number of roadway <br />miles. Few major committed transportation improvements are identified for the metropolitan <br />area south of the TH 10/610 improvements. <br />MnlDOT Metro Division Pro2rammed Transportation Improvements for F.Y.1999-2003 <br />Implementation Agency Facility or Route Project Description <br />Mn/DOT 1-94 At Weaver Lake Rd in Maple Grove - extend <br /> ramp <br />Mn/DOT 1-94 Addition of 3fd lane between Weaver Lake <br /> Road and Brooklyn Blvd <br />Mn/DOT 1-94/ Weaver Lake Rd Loop/interchang;e revisions <br />Mn/DOT 1-94/ CR 61 Interchange revisions <br />Mn/DOT 1-94/ CR 30 Realig;nment work <br />Source: State Transportation Improvement Program (STIP) 1999-2001; Metropolitan Development Guide; Hennepin County <br /> Transportation Systems Plan; Hennepin County Capital Improvement Plan. <br /> . <br /> 4 - <br />Phase II Northstar Corridor Major Investment Study <br />Draft - No-Build Alternative June 10, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.