My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5 ERMUSR 07-11-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
07-11-2017
>
2.5 ERMUSR 07-11-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 2:03:58 PM
Creation date
7/10/2017 2:03:51 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pressure Zones • Expansion/addition Unknown at The gravel mine <br /> this time. areas in Elk River <br /> will be developed <br /> in the future.The <br /> elevations will <br /> force us to add <br /> another pressure <br /> zone. <br /> Proposed Future Water Sources <br /> Complete Table 13 to identify new water source installation planned over the next ten years.Add rows <br /> to the table as needed. <br /> Table 13.Proposed future installations/sources <br /> Groundwater None <br /> Surface Water None <br /> Interconnection None <br /> to another <br /> supplier <br /> Water Source Alternatives-Key Metropolitan Council Benchmark <br /> Do you anticipate the need for alternative water sources in the next 10 years? -No <br /> For metro communities,will you need alternative water sources by the year 2040? NA <br /> If you answered yes for either question,then complete table 14. If no, insert NA. <br /> Complete Table 14 by checking the box next to alternative approaches that your community is <br /> considering, including approximate locations(if known),the estimated amount of future demand that <br /> could be met through the approach, the estimated timeframe to implement the approach, potential <br /> partnerships, and the major benefits and challenges of the approach. Add rows to the table as needed. <br /> For communities in the seven-county Twin Cities metropolitan area,these alternatives should include <br /> approaches the community is considering to meet projected 2040 water demand. <br /> Table 14.Alternative water sources <br /> 1 f <br /> Groundwater NA ---- <br /> Surface Water NA ---- <br /> Reclaimed Stormwater NA ---- <br /> Reclaimed Wastewater NA ---- <br /> Interconnection to NA <br /> anothotherr supplier <br /> 22 <br /> 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.