Laserfiche WebLink
F. Capital Improvement Plan (CIP) <br /> Please note that any wells that received approval under a ten-year permit, but that were not built, are <br /> now expired and must submit a water appropriations permit. <br /> Adequacy of Water Supply System <br /> Complete Table 12 with information about the adequacy of wells and/or intakes,storage facilities, <br /> treatment facilities, and distribution systems to sustain current and projected demands. List planned <br /> capital improvements for any system components, in chronological order. Communities in the seven- <br /> county Twin Cities metropolitan area should also include information about plans through 2040. <br /> The assessment can be the general status by category; it is not necessary to identify every single well, <br /> storage facility,treatment facility, lift station,and mile of pipe. <br /> Please attach your latest Capital Improvement Plan as Appendix 4. <br /> Table 12.Adequacy of Water Supply System <br /> Wells/Intakes • No action planned -adequate <br /> Water Storage Facilities • No action planned -adequate <br /> Water Treatment Facilities • Expansion/addition 2016 Adding a pressure <br /> filter to WTP#7 to <br /> facilitate the <br /> treatment of Well <br /> #9. <br /> Distribution Systems(pipes,valves, • Repair/replacement 2017 Plans to replace <br /> etc.) roughly 2,000'of <br /> CIP water main <br /> with DIP water <br /> main. <br /> Distribution Systems(pipes,valves, • Expansion/addition Unknown at The City of Elk <br /> etc.) this time. River has plans <br /> to develop <br /> eastward down <br /> Highway 10,and <br /> North up <br /> Highway 169. <br /> The timeframe <br /> for these <br /> projects has not <br /> yet been set. <br /> 21 <br /> 61 <br />