Laserfiche WebLink
<br />. <br /> <br />Memorandum-Land Use and <br />Station Area Planning Program <br />April 28, 1999 <br />Page 7 <br /> <br />b. Contacts/Reviews: Contacts/Reviews: Visit the municipalities identified in <br />2.2.1, to review the existing conditions, forces/issues, and concept site plans <br />with staff, officials, and the community or to those required per the particular <br />City's process for review as identified during the Inventory/Introduction <br />phase. It is anticipated that at least one member of the Northstar Corridor <br />Station Area Planning Team will be in attendance at each of these meetings. <br /> <br />c. Work Products: Prepare the following technical documents and presentation <br />graphics for use as illustrations of station area planning efforts: <br /> <br />1. TECHNICAL MEMORANDUM ON ST A nON DESIGN GUIDELINES: <br />Prepare in text format, standard guidelines which directs the on-going <br />design efforts for station area site planning, platform and architectural <br />components <br /> <br />. <br /> <br />2. CONCEPT STATION AREA PLAN: Utilizing the aerial photography <br />identified above as a base plan, BRW will prepare a concept plan for each <br />proposed station area, illustrating the existing site forces and issues which <br />may influence station location and design. This plan will graphically <br />illustrate as an overlay, the base information of existing track location and <br />proposed station location(s), major landmarks, and street names. The site <br />plan will conceptually illustrate design elements to include platform and <br />canopy configuration, parking lot layout and ingress/egress, feeder bus <br />parking layout and ingress/egress, station area pedestrian circulation, <br />potential storm water detention/retention areas, and drop-off and ride areas. <br /> <br />d. Schedule: A majority of the planning and plan preparation work will be <br />accomplished during the months of June, July and August. <br /> <br />Subtask 2.2.4 Station Site Planning (Final) <br /> <br />a. Goal: Provide revised station area planning based on feedback received <br />during Subtask 2.2.3 <br /> <br />b. Contacts/Reviews: Recycle the municipal review process to receive input <br />based on the revised station area plans. <br /> <br />c. Work Products: Prepare revised concept plans, and any supporting plans <br />necessary such as station/platform cross sections and plans. <br /> <br />. <br /> <br />d. Schedule: A majority of the planning and plan preparation work will be <br />accomplished during the months of August and September, with reviews <br />occurring in late September through October. Any additional plan revisions <br />could then occur through November. <br />