My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 02-07-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/07/2005
>
6.3. SR 02-07-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:09 AM
Creation date
2/3/2005 3:00:48 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />IV. EXISTING CONDITIONS <br /> <br />Street <br /> <br />A summary of the streets to be reconstructed including existing width and whether or not <br />concrete curb and gutter and sidewalk exist is presented in the following table: <br /> <br />Street Length Existing Width Curb and Sidewalk <br />(feet) (feet) Gutter <br />Upland Avenue 1365 20 No No <br />Tipton Avenue 825 25 No No <br />Fifth Street 305 19 No No <br />(Upland to West End) <br />Fifth Street 315 32 No No <br />(Sevmour to West End) <br />Fifth Street 305 32 No No <br />(Sevmour to Rush) <br />Fifth Street 860 39 Yes One Side <br />(Rush to Proctor) <br />Fifth Street 425 40 Yes Both Sides <br />(Proctor to Oxford) <br />Fifth Street 580 34 No No <br />(Oxford to Norfolk) <br />Seymour Avenue 275 14 No No <br />Rush Avenue 275 32 No No <br />Quinn Avenue 260 28 No No <br />Oxford Avenue 160 32 No One Side <br />Norfolk Avenue 240 28 Yes One Side <br /> <br />In late fall of 2004, a geotechnical evaluation was performed in the area of the 2005 <br />Street Reconstruction Project. Eighteen soil borings were taken, one on each street <br />block of the project. The soil borings indicated between 2-inches and 6-inches of <br />existing bituminous and between 3-inches and 8-inches of aggregate base material <br />throughout the study area. The geotechnical report is provided as Appendix A. <br /> <br />Sanitary Sewer <br /> <br />8-inch sanitary sewer is located on all the streets in the study area with the exception of <br />Rush Avenue, Quinn Avenue, and Oxford Avenue where there is currently no sanitary <br />sewer. The majority of the existing sanitary sewer is made of concrete, with a few <br />segments constructed of vitrified clay pipe. The existing sanitary sewer system is shown <br />on Exhibit 2. <br /> <br />Watermain <br /> <br />4-inch ductile iron pipe watermain is located on all the streets in the study area with the <br />exception of Seymour Avenue and Quinn Avenue where there is currently no watermain. <br />The existing watermain is shown on Exhibit 3. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.