Laserfiche WebLink
th <br />2.9185Avenue <br />th <br />185 Avenue is a collector road that provides access to several surrounding businesses and <br />residential areas. The pavement is in overall fair condition but shows several transverse and <br />longitudinal cracks and is in need of additional strength. <br />A bituminous overlay is proposed to provide additional structural strength and extend the life of <br />the pavement. Edged milling will be performed along the concrete curb and gutter such that the <br />new overlay will match the existing curb elevations. In the locations adjacent to Trunk Highway <br />10 where a center median exists, the existing bituminous will be milled to a uniform depth to <br />prepare the roadway for the overlay. The existing road will be the same elevation, or slightly <br />higher, than existing. <br />th <br />The total estimated project cost for 185 Avenue is $212,766. The limits of the project are <br />depicted below in Figure 10. <br />Figure 10 <br />th <br />185 Avenue <br /> <br />City of Elk River, Minnesota 11 | Page <br />2017 Street and Utility Improvements <br />