Laserfiche WebLink
thth <br />2.8 198Avenue, Troy Street, Victoria Street and 197Circle <br />The roads in this area are in fairly good condition with the exception of a few isolated areas. The <br />th <br />pavement surface on the west end of 198 Avenue is deteriorated and has little separation from <br />the surface water in the adjacent wetlands. There are isolated areas of pavement failures and <br />also a few areas that have been patched that have also failed. <br />th <br />It is proposed that a segment of 198 Av of Zebulon <br />Street NW, will be reclaimed. Additional reclaim material will be added in this segment to <br />increase the aggregate base strength and separation from the adjacent wetland water elevation. <br />Failed areas of bituminous on the remaining segments will be patched. An overlay will be <br />constructed over the entire project area to add structural strength and extend the pavement life. <br />thth <br />The total estimated cost for 198 Avenue, Troy Street, Victoria Street and 197 Circle is <br />$271,346. The project limits are depicted below in Figure 9. <br />Figure 9 <br />thth <br />198 Avenue, Troy Street, Victoria Street, 197 Circle <br /> <br />City of Elk River, Minnesota 10 | Page <br />2017 Street and Utility Improvements <br />