Laserfiche WebLink
th <br />2.7 209Avenue <br />th <br />The portion of 209 Avenue from Meadowvale Road NW to the City limits was evaluated. The <br />road is a collector street and provides access to residential properties on the north side of the <br />owvale <br />Road NW. The in-slopes adjacent to the existing wetlands are currently steeper than desired. <br />The proposed rehabilitation method is a full depth reclamation. The existing bituminous <br />pavement will be reclaimed into the underlying aggregate base. In the area of the existing <br />wetlands, the reclaim material will be removed such that the subgrade can be excavated. The <br />reclaim material will be replaced and supplemented with additional reclaim material to provide <br />additional strength prior to paving. A new bituminous surface will be constructed and the <br />pavement markings will be re-applied. The finished elevation will be the same or slightly lower <br />than existing. <br />th <br />The total estimated cost of 209 Avenue is $113,325. The limits of the proposed project are <br />depicted below in Figure 8. <br />Figure 8 <br />th <br />209 Avenue <br /> <br />City of Elk River, Minnesota 9 | Page <br />2017 Street and Utility Improvements <br />