Laserfiche WebLink
Project. Wastewater Treatment Facility Improvements 2014 Owner: Cityof Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Application Number 24 <br />Date of application 10/31/2016 <br />Work completed through: 10/312016 <br />EJCDC No. C-620 (2002 Edition) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Conon,ton of America and the Construction Specifications Institute. <br />Page 7 of 7 <br />Item <br />B <br />C <br />D <br />E <br />Total Completed <br />% <br />Balance to <br />Pay Item <br />Number <br />Description <br />Scheduled Value <br />From Previous <br />Application(C+D) <br />This Period <br />Materials Presently <br />Stored (not in Col D) <br />and Stored to Date <br />(C+D+E) <br />(F) <br />Finish <br />15400.3 <br />-Waste & Vent Piping <br />15400.3.1 <br />-Purchase <br />$30,000.00 <br />$30,000.00 <br />$30,000.00 <br />100.00 <br />$0.00 <br />15400.32 <br />-Install <br />$62,000.00 <br />$62,000.00 <br />$62,000.00 <br />100.00 <br />$0.00 <br />15480 <br />Packaged Compressed Air System <br />15480.1 <br />-Purchase <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />100.00 <br />$0.00 <br />15480.2 <br />-Install <br />$1,500.00 <br />$1,500.001 <br />$1,500,001 <br />100.00 <br />$0.00 <br />15500 <br />HVAC <br />15500.1 <br />EWipment <br />$286,200.00 <br />$213,044.00 <br />$46,589.00 <br />$259,633.00 <br />90.72 <br />$26,567.00 <br />15500.2 <br />Labor <br />$169,020.00 <br />$102,149.00 <br />$18.178.50 <br />$120,327.50 <br />71A9 <br />$48,692.50 <br />15500.3 <br />Duct Insulation <br />$24,780.00 <br />$4,460.40 <br />$4,956.00 <br />$9,416.40 <br />3800 <br />$15,363.60 <br />15500.4 <br />Test &Balance <br />$5,000.00 <br />$1,500.00 <br />$1,500.00 <br />Woo <br />$3,500.00 <br />15950 <br />HVAC Controls <br />$67,400.00 <br />$32,000.00 <br />$32,000.00 <br />47.48 <br />$35,400.00 <br />16000 <br />Electrical <br />16000.1 <br />General Provisions <br />$55,000.00 <br />$51,080.00 <br />$1,100.00 <br />$52,180.00 <br />9487 <br />$2.820.00 <br />16000.2 <br />Basic Materials and Methods <br />$265,000.00 <br />$224,520.00 <br />$12,100.00 <br />$236,620 00 <br />89.29 <br />$28,380.00 <br />16000.3 <br />Motors <br />$32,000.00 <br />$27,095.00 <br />$900.00 <br />$27,995.00 <br />87.48 <br />$4,005.00 <br />160004 <br />Power Generation System <br />$414.000.00 <br />$414,000.00 <br />$414,000.00 <br />100.00 <br />$0.00 <br />16000.5 <br />Electrical Distribution <br />$385,000.00 <br />$374,040.00 <br />$2,100.00 <br />$376,140.00 <br />97.70 <br />$8.860.00 <br />16000.6 <br />Lighting <br />$85,000.00 <br />$51,800.00 <br />$1,850.00 <br />$53,650.00 <br />63.12 <br />$31,350.00 <br />16000.7 <br />Special Systems <br />$24,000.00 <br />$16.610.00 <br />$1,100.00 <br />$17,710.00 <br />73.79 <br />$6,290.00 <br />16000.8 <br />Starters and Motor Control <br />$330,000.00 <br />$317,000.00 <br />$1,100.00 <br />$318,100.00 <br />96.39 <br />$11,900.00 <br />16000.9 <br />Instrumentation and Control <br />$480,000.00 <br />$468,450.00 <br />$468,450.00 <br />97.59 <br />$11550.00 <br />Change Order No. 1 <br />$259,991.59 <br />$259,99159 <br />$259,991.59 <br />100.00 <br />$0.00 <br />$16,785,191.59 <br />$15,150,660.81 <br />$351,719.06 <br />$0.00 <br />$15,502,379.87 <br />92.36 <br />$1,295,080.31 <br />EJCDC No. C-620 (2002 Edition) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Conon,ton of America and the Construction Specifications Institute. <br />Page 7 of 7 <br />