Laserfiche WebLink
FINAL PAYMENT <br />CITY OF ELK RIVER <br />Natures Edge Business Center - Phase 2 Improvements <br />August 31, 2016 <br />Honorable Mayor & City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River. MN 55330 <br />RE: Natures Edge Business Center - Phase 2 Improvements <br />Contractor: LaTour Construction, Inc. <br />Contract Amount: $1,311,227.89 <br />Award Date: September 18, 2014 <br />Completion Date: July 15, 2015 <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above -referenced project by LaTour Construction, Inc. <br />Bid Schedule W' - Street Construction <br />ITEM <br />NO. <br />I ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />CLEARING <br />2.30 <br />ACRE <br />$4100.00 $ <br />9430.00 <br />2.46 <br />$ <br />10086,00 <br />2 <br />GRUBBING <br />2.30 <br />ACRE <br />$4100.00 $ <br />9430.00 <br />2.46 <br />$ <br />10086.00 <br />3 <br />REMOVE PIPE CULVERTS <br />26 <br />LIN FT <br />$7.00 $ <br />182.00 <br />26 <br />$ <br />182.00 <br />4 <br />REMOVE BITUMINOUS. PAVEMENT <br />811 <br />SQ YD <br />$2.80 $ <br />2270.80 <br />811 <br />2270.80 <br />5 <br />SALVAGE RANDOM RIPRAP <br />20 <br />CU YD <br />$9.00 <br />180.00 <br />20 <br />$ <br />180.00 <br />6 <br />COMMON EXCAVATION E P <br />152.868 <br />CU YD <br />$1.88 $ <br />287 391.84 <br />152,868 <br />$ <br />287 391.84 <br />7 <br />AGGREGATE BASE CLASS 5 - TRAIL CV P <br />325 <br />CU YD <br />$27.00 $ <br />8J75.00 <br />325 <br />$ <br />8,775.00 <br />8 <br />AGGREGATE BASE CLASS 5 - STREET CV P <br />2,705 <br />CU YD <br />$21.80 $ <br />58 969.00 <br />2,705 <br />$ <br />58 969.00 <br />9 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />433 <br />GALLONS <br />$3.20 $ <br />1,385.60 <br />520 <br />$ <br />1,664.00 <br />10 <br />TYPE SP 12.5 WEARING COURSE MIXTURE 2,B 2.5" THICK <br />1,674 <br />SQ YD <br />$10.40 $ <br />17 409.60 <br />1,538 <br />$ <br />15 995.20 <br />11 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (3,B) 2.0" THICK <br />8,650 <br />SQ YD <br />$7.90 $ <br />68 335.00 <br />8,650 <br />$ <br />68 335.00 <br />12 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 2.5" THICK <br />8,650 <br />SQ YD <br />9.40 <br />81 310.00 <br />8,650 <br />$ <br />81 310.00 <br />13 <br />4" POLYSTYRENE INSULATION <br />30 <br />SY <br />$46.50 $ <br />1,395.00 <br />14.22 <br />$ <br />661.23 <br />14 <br />6" CONCRETE WALK <br />949 <br />SQ FT <br />5.35 $ <br />5077.15 <br />897 <br />$ <br />4.796.95 <br />15 <br />CONCRETE CURB & GUTTER DESIGN 8618 <br />3,737 <br />LIN FT <br />$10.50 $ <br />39 238.50 <br />3,779 <br />$ <br />39 679.50 <br />16 <br />TRUNCATED DOMES <br />64 <br />SQ FT <br />$31.00 $ <br />1.984.00 <br />60 <br />$ <br />1 860.00 <br />17 <br />TYPE III BARRICADES <br />7 <br />EACH <br />$245.00 <br />1 715.00 <br />7 <br />$ <br />1715.00 <br />18 <br />FURNISH SIGN PANELS TYPE C <br />23 <br />SO FT <br />39.00 $ <br />897.00 <br />23 <br />$ <br />897.00 <br />19 <br />SILT FENCE, TYPE MS <br />6P708 <br />LIN FT <br />$1.85 <br />12 409.80 <br />6 524 <br />$ <br />12 069.40 <br />20 <br />STORM DRAIN INLET PROTECTION <br />9 <br />EACH <br />$240.00 $ <br />2160.00 <br />9 <br />$ <br />2160.00 <br />21 <br />STABILIZED CONSTRUCTION EXIT <br />1 <br />LUMP SUM <br />$990.00 $ <br />990.00 <br />1 <br />$ <br />990.00 <br />22 <br />EROSION CONTROL SUPERVISOR <br />1 <br />LUMP SUM <br />$3250.00 $ <br />3250.00 <br />1.00 <br />$ <br />3250.00 <br />23 <br />SEEDING <br />39 <br />ACRE <br />$97.00 $ <br />3783.00 <br />36.51 <br />$ <br />3541.47 <br />24 <br />SEED MIXTURE 25-121 <br />2379 <br />POUND <br />$4.55 $ <br />10824.45 <br />2.254 <br />$ <br />10255.70 <br />25 <br />MULCH MATERIAL TYPE 1 <br />78 <br />TON <br />$235.00 $ <br />18 330.00 <br />58.5 <br />$ <br />13 747.50 <br />26 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />20,640 <br />SO YD <br />$1.15 <br />23 736.00 <br />23,350 <br />$ <br />26 852.50 <br />27 <br />FERTILIZER TYPE I <br />11700 <br />POUND <br />$0.45 a <br />5265.00 <br />9,277 <br />$ <br />4174.65 <br />28 <br />EROSION CONTROL <br />1 <br />LUMP SUM <br />$3.500.00 $ <br />3,500.00 <br />1.00 <br />$ <br />3,500.00 <br />29 <br />PAVEMENT MESSAGE LT ARROW) EPDXY <br />2 <br />EACH <br />$153.00 $ <br />306.00 <br />$ <br />30 <br />PAVEMENT MESSAGE RTARRO EPDXY <br />2 <br />EACH$153.00 <br />$ <br />306.00 <br />s <br />31 <br />4" SOLID LINE WHITE- EPDXY <br />550 <br />LIN FT <br />$0.80 $ <br />440.00 <br />$ <br />32 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />1 456 <br />LIN FT <br />$1.001 $ <br />1,456.00 <br />1,379 <br />$ <br />1,379.00 <br />33 <br />CROSSWALK MARKING - EPDXY <br />162 1 <br />SQ FT 1 <br />$8.201 $ <br />1.328 '- <br />162 <br />$ <br />1,328.40 <br />Total Bid Schedule "A" $ 663,460.14 $ 678.106.74 <br />S:VNunicipalWelkriver1ER302tPay Estimates\ER302 PE PE - 1 <br />