Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner City of Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton 8 Menk, Inc. <br />Application Number 24 <br />Dale of application 10/312016 <br />Work completed through: 10/312016 <br />Page 6 of 7 <br />Rem <br />B <br />C <br />D <br />E <br />Total Completed <br />% <br />Balance to <br />Pay Rem <br />Number <br />Description <br />Scheduled Value <br />From Previous <br />Application (C+D) <br />This PeriodMalenals <br />Presently <br />Sloretl (not in MID) <br />and Stored to Date <br />(C + D + E) <br />(, <br />Finish <br />11386.1 <br />-Purchase <br />$26,000.00 <br />$26,000.00 <br />$28,000.00 <br />10000 <br />$0.00 <br />11386.2 <br />-Install <br />$3,500.00 <br />$3,500.00 <br />$3.500.00 <br />100.00 <br />$0.00 <br />11387 <br />Submersible Mixers <br />11387.1 <br />-Purchase <br />$75,000.00 <br />$75,000.00 <br />$75,000.00 <br />100.00 <br />$0.00 <br />11387.2 <br />-Install <br />$12,000.00 <br />$12,000.00 <br />$12,000.00 <br />100.00 <br />$0.00 <br />11636 <br />Phosphorus Analyzer <br />11636.1 <br />-Purchase <br />$26,000.00 <br />$26,000.00 <br />$26,000.00 <br />100.00 <br />$0.00 <br />11636.2 <br />-Install <br />$5,000.00 <br />$5,000.00 <br />$5.000.00 <br />100.00 <br />$0.00 <br />12346 <br />CaseworklLab Eq. <br />$45,000.00 <br />$4,000.00 <br />$4.000.00 <br />8.89 <br />$41,000.00 <br />13126 <br />Circular Tank Covers <br />13126.1 <br />-Purchase <br />$292,837.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$292,837.00 <br />13126.2 <br />-Install <br />$75,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$75,000.00 <br />14300 <br />Hoists 8 Cranes <br />14300.1 <br />-Purchase <br />$40,000.00 <br />$0.00 <br />$40,000.00 <br />$40,000.00 <br />100.00 <br />$0.00 <br />14300.2 <br />-Install <br />$12,000.00 <br />$0.00 <br />$12,000.00 <br />$12,000.00 <br />100.00 <br />$0.00 <br />14500 <br />Material Handling Equipment <br />14500.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />14500.2 <br />-Install <br />$2,500.00 <br />$000 <br />$0.00 <br />0.00 <br />$2,500.00 <br />14600 <br />Conveyance Equipment <br />14600.1 <br />-Purchase <br />$135,000.00 <br />$135,000.00 <br />$135,000.00 <br />100.00 <br />$0.00 <br />14600.2 <br />-Install <br />$22,250.00 <br />$22,250.00 <br />$22,250.00 <br />100.00 <br />$0.00 <br />14621 <br />Power Winch <br />14621.1 <br />-Pumhase <br />$20,00000 <br />$20,000.00 <br />$20,000.00 <br />100.00 <br />$0.00 <br />14621.2 <br />-Install <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />100.00 <br />$0.00 <br />15060 <br />Process Piping <br />15060.1 <br />-Purchase <br />$650,000.00 <br />$650,000.00 <br />$650,000.00 <br />100.00 <br />$0.00 <br />15060.2 <br />dnstall <br />$200,000.00 <br />$200.000.00 <br />$200,000.00 <br />100.00 <br />$0.00 <br />15100 <br />Valves <br />15100.1 <br />-Purchase <br />$265,000.00 <br />$265,000.00 <br />$265,000.00 <br />100.00 <br />$0.00 <br />15100.2 <br />-Install <br />$110,000.00 <br />$110,000.00 <br />$110,000.00 <br />100.00 <br />$0.00 <br />15300 <br />Fire Protection <br />$45,000.00 <br />$6,950.00 <br />$38,050.00 <br />$15,000.00 <br />100.00 <br />$0.00 <br />15400 <br />Plumbing <br />15400.1 <br />-Copper Piping <br />15400.1.1 <br />-Purchase <br />$45,000.00 <br />$36,250.00 <br />$5,000.00 <br />$41,250.00 <br />91.67 <br />$3,750.00 <br />15400.1.2 <br />4nstall <br />$100,000.00 <br />$84,000.00 <br />$10,000.00 <br />$94,000.00 <br />94.00 <br />$6,000.00 <br />15400.2 <br />-Chemical Piping <br />15400.2.1 <br />-Purchase <br />$18,000.00 <br />$18,000.00 <br />$18,000.00 <br />10000 <br />$0.00 <br />15400.2.2 <br />-Install <br />$22,000.00 <br />$22,00000 <br />$22,000.00 <br />10000 <br />$000 <br />Page 6 of 7 <br />