Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River <br />Contractor. Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Application Number 24 <br />Date of application 10/31/2016 <br />Work completed through: 10/31/2016 <br />Page 5 of 7 <br />gem <br />B <br />C D <br />E Total Completed <br />% <br />Balance to <br />Pay Item <br />Number <br />Description <br />Scheduled Value <br />From Previous This Period <br />Application (C -D) <br />Materials Presently and Stored to Dale <br />Stored (not in Col D) (C + D t E) <br />L) <br />Finish <br />09900 <br />Painting <br />$373,921.00 <br />$324,500.00 <br />$324,500.00 <br />86.78 <br />$49,421.00 <br />10110 <br />Marker Boards/Toilet Compartmentsrrollet Accessories <br />10110.1 <br />-Purchase <br />$8,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$8,000.00 <br />101102 <br />-Install <br />$3,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,000.00 <br />10250 <br />Safety Devices <br />10250.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0+001 <br />0.00 <br />$10.000.00 <br />10250.2 <br />-Install <br />$3,500.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,500.00 <br />10505 <br />Metal Lockers <br />10505.1 <br />-Purchase <br />$10,000.00 <br />$10,000.00 <br />$10,000.00 <br />100.00 <br />$0.00 <br />10505.2 <br />-Install <br />$4,000.00 <br />$0.00 <br />$0.00 <br />000 <br />$4,000.00 <br />11280 <br />Hydraulic Gates <br />11280.1 <br />-Purchase <br />$50,000.00 <br />$50,000.00 <br />$50,000.00 <br />100.00 <br />$0.00 <br />11280.2 <br />-Install <br />$20.000.00 <br />$20.000.00 <br />$20,000.00 <br />100.00 <br />$0.00 <br />11311 <br />Submersible Centrifugal Pumps <br />11311.1 <br />-Purchase <br />$278.868.00 <br />$278,868.00 <br />$278,868.00 <br />100.00 <br />$0.00 <br />11311.2 <br />-Install <br />$25.000.00 <br />$25,000.00 <br />$25,000.00 <br />100.00 <br />$0.00 <br />11345 <br />Chlorination & Dechlorination Eq. <br />11345.1 <br />-Purchase <br />$330,000.00 <br />$330,000.00 <br />$330,000.00 <br />100.00 <br />$0.00 <br />11345.2 <br />-Install <br />$20,000.00 <br />$20,000.00 <br />$20,000.00 <br />100.00 <br />$0.00 <br />11351 <br />Clarifier Equipment <br />11351.1 <br />-Purchase <br />$15,000.00 <br />$15,000.00 <br />$15,000.00 <br />100.00 <br />$0.00 <br />11351.2 <br />-Install <br />$12,000.00 <br />$12,000.00 <br />$12,000.00 <br />100.00 <br />$0.00 <br />11356 <br />Screw Press <br />11356.1 <br />-Purchase <br />$575,000.00 <br />$575,000.00 <br />$575,00000 <br />100.00 <br />$0.00 <br />11356.2 <br />-Install <br />$25,000.00 <br />$25,000.00 <br />$25,000.00 <br />100.00 <br />$0.00 <br />11374 <br />Fine Pore Aeration Equipment <br />11374.1 <br />-Purchase <br />$100,000.00 <br />$100,000.00 <br />$100,000.00 <br />100.00 <br />$0.00 <br />11374.2 <br />-Install <br />$75,000.00 <br />$75,000.00 <br />$75,000.00 <br />100.00 <br />$0.00 <br />11375 <br />Blower System (PD w/Enclosure) <br />11375.1 <br />-Purchase <br />$180,000.00 <br />$180,000.00 <br />$180,000.00 <br />100.00 <br />$0.00 <br />11375.2 <br />-Install <br />$30,000.00 <br />$30,000.00 <br />$30,000.00 <br />100.00 <br />$0.00 <br />11376 <br />Hybrid Blower System (Alt. No. 2) <br />11376.1 <br />-Purchase <br />$270,000.00 <br />$270,000.00 <br />$270,000.00 <br />100.00 <br />$0.00 <br />11376.2 <br />-Install <br />$25,000.00 <br />$25,000.00 <br />$25,000.00 <br />100.00 <br />$0.00 <br />11385 <br />Coarse Bubble Aerobic Digester Mixing System <br />11385.1 <br />-Purchase <br />$65,000.00 <br />$61,750.00 <br />$61,750.00 <br />95.00 <br />$3,250.00 <br />11385.2 <br />-Install <br />$40,000.00 <br />$25,000.00 <br />$25,000.00 <br />62.50 <br />$15,000.00 <br />11388 <br />Rapid Mixers <br />Page 5 of 7 <br />