Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Application Number 24 <br />Date of application 10/31/2016 <br />Work completed through: 10/31/2016 <br />Page 4 of 7 <br />Item <br />B <br />C <br />D E <br />Total Completed <br />% <br />Balance to <br />Pay Item <br />Number <br />Description <br />Scheduled Value <br />From Previous <br />Applicabon(C-D) <br />This Period Materials Presently <br />Stored(notin Col D) <br />and Stored to Date <br />(C+D+E) <br />(F) <br />Finish <br />02220.2 <br />- New Proposed Aerated Biosolids Control Bldg 2 <br />$65,000.00 <br />$65,000.00 <br />$65.000.00 <br />100.00 <br />$0.00 <br />02220.3 <br />- New RASNVAS Building <br />$58,000.00 <br />$58,000.00 <br />$58,000.00 <br />10000 <br />$0.00 <br />02220.4 <br />- New Operations Building <br />$85,000.00 <br />$85,000.00 <br />$85,000.00 <br />100.00 <br />$0.00 <br />02550 <br />Site Piping <br />02550.1 <br />-Purchase <br />$690,000.00 <br />$690,000.00 <br />$690,000.00 <br />100.00 <br />$0.00 <br />02550.2 <br />-Install <br />$426,947.00 <br />S426.947.001 <br />$426.947.001 <br />100.00 <br />$0.00 <br />02600 <br />Bituminous Pavement/Class &Sidewalks <br />$149,490.00 <br />$95,000.00 <br />$25.000.00 <br />$120,000.00 <br />80.27 <br />$29,490.00 <br />02830 <br />Chain Link Fence & Gates <br />$18,890.00 <br />$10.000.00 <br />$10,000.00 <br />52.94 <br />$8.890.00 <br />02835 <br />Retaining Walls <br />$25,000.00 <br />$25,000.00 <br />$25,000.00 <br />100.00 <br />$0.00 <br />02920 <br />Seeding/Landscaping <br />$16,000.00 <br />$5,000.00 <br />$8,000.00 <br />$13,000.00 <br />81.25 <br />$3,000.00 <br />03200 <br />Concrete Reinforcement <br />03200.1 <br />-Purchase <br />$661,997.00 <br />$661,997.00 <br />$661,997.00 <br />100.00 <br />$0.00 <br />03200.2 <br />-Install <br />$312,165.00 <br />$312,165.00 <br />$312,165.00 <br />100.00 <br />$0.00 <br />03300 <br />Concrete Work <br />03300.1 <br />-Aeration Basin <br />$1,190.000.00 <br />$1,190,000.00 <br />$1,190,000.00 <br />100.00 <br />$0.00 <br />03300.2 <br />-RASNVAS Building <br />$215,000.00 <br />$215,000.00 <br />$215,000.00 <br />100.00 <br />$0.00 <br />03300.3 <br />-Aerated Biosolids Control Bldg No. 2 <br />$110,000.00 <br />$110,000.00 <br />$110,000.00 <br />100.00 <br />$0.00 <br />03300A <br />-Operations Building <br />$148,000.00 <br />$148,000.00 <br />$148.000.00 <br />100.00 <br />$0.00 <br />03300.5 <br />-Generator& Tmnsfurmer Pads <br />$20,000.00 <br />$20,00000 <br />$20,000.00 <br />100.00 <br />$0.00 <br />03400 <br />Precast Walls & Plank <br />$1,062,500.00 <br />$1,062,500.00 <br />$1,062,500.00 <br />100.00 <br />$0.00 <br />04810 <br />Masonry <br />$75,000.00 <br />$75,000.00 <br />$75,000.00 <br />100.00 <br />$0.00 <br />05500 <br />Misc. Metals <br />05500.1 <br />-Purchase <br />$200,000.00 <br />$200,000.00 <br />$200,000.00 <br />100.00 <br />$0.00 <br />055002 <br />-Install <br />$95,000.00 <br />$95,000.00 <br />$95,000.00 <br />100.00 <br />$0.00 <br />06100 <br />Carpentry <br />06100.1 <br />-Purchase <br />$18,00000 <br />$18,000.00 <br />$18,000.00 <br />100.00 <br />$0.00 <br />06100.2 <br />-Install <br />$22,000.00 <br />$22,000.00 <br />$22,000.00 <br />100.00 <br />$0.00 <br />07150 <br />Dampproofing <br />$31,638.00 <br />$31,638.00 <br />$31,638.00 <br />100.00 <br />$0.00 <br />07535 <br />Roofing <br />$235.078.00 <br />$200,701.00 <br />$34,377.00 <br />$235,078.00 <br />100.00 <br />$0.00 <br />07900 <br />Caulking <br />$26,870.00 <br />$17,500.00 <br />$17,500.00 <br />65.13 <br />$9,370.00 <br />08110 <br />Doors & Frames <br />08110.1 <br />-Purchase <br />$57,780.00 <br />$57,780.00 <br />$57,780.00 <br />100.00 <br />$0.00 <br />08110.2 <br />-Install <br />$35,000.00 <br />$35,000.00 <br />$35,000.00 <br />100.00 <br />$0.00 <br />08360 <br />Upward Acting Sectional Doors <br />$36,600.00 <br />$36.600.00 <br />$36,600.00 <br />100.00 <br />$0.00 <br />08500 <br />Windows <br />$25,000.00 <br />$25,000.00 <br />$25,000.00 <br />100.00 <br />$0.00 <br />08800 <br />Steel Studs/Gypsum <br />$22,869.00 <br />$17,000.00 <br />$5,869.00 <br />$22,869.00 <br />100.00 <br />$0.00 <br />09310 <br />CeramiclResilient Tile <br />$30,000.00 <br />$12,000.00 <br />$2,500.00 <br />$14,500.00 <br />48.33 <br />$15,500.00 <br />09510 <br />Acoustical Coiling <br />$6.500.001$0,001 <br />$0.00 <br />0.00 <br />$6,500.00 <br />Page 4 of 7 <br />