Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner. City of Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Application Number, 24 <br />Date of application 7 0/312 01 6 <br />Work completed through: 10/312016 <br />Page 3 of 7 <br />Item <br />8 <br />C <br />D E <br />Total Completed <br />% <br />Balance to <br />Pay Item <br />Number <br />Description <br />Scheduled Value <br />From Previous <br />Application (C -D) <br />This Period Materials Presently <br />Stored (not in Cal D) <br />and Stored to Dale <br />(C + D + E) <br />(F) <br />Finish <br />01005.34 <br />COP#31 - Field Order 25 <br />$3,538.55 <br />$3,538.55 <br />$3,538.55 <br />100.00 <br />$0.00 <br />0100535 <br />COP#32-Field Order l8 <br />$4,187.88 <br />$4,187.88 <br />$4.187.88 <br />100.00 <br />$0.00 <br />01005.36 <br />COP#33- Trickling Filter Disposal Costs <br />$83,364.51 <br />$0.00 <br />$0.00 <br />0.00 <br />$83,364.51 <br />0100537 <br />COP#34-Field Order 24 <br />$17,918.33 <br />$17,918.33 <br />$17,918.33 <br />100.00 <br />$0.00 <br />01005.38 <br />COP#35-Additional Demo <br />$6,175.22 <br />$6,175.22 <br />$6,175.22 <br />100.00 <br />$0.00 <br />01005.39 <br />COP#36- Reaction Tank Drains <br />$1,645.15 <br />$1,645.151 <br />$1,645.151 <br />100.00 <br />$0.00 <br />01005.40 <br />COP#37- Retaining Wall Credit <br />($1,000.00) <br />($1,00000) <br />($1,000.00) <br />100.00 <br />$0.00 <br />01005.41 <br />COP#38- Platforms for Screw Presses <br />$45,528.25 <br />$0.00 <br />$0.00 <br />0.00 <br />$45,528.25 <br />01005.42 <br />COP#39- Airline for Holding Tank 2 <br />$3,509.66 <br />$3,509.66 <br />$3,509.66 <br />100.00 <br />$0.00 <br />01005.43 <br />COP#40- RASANAS Wetwell Transducer <br />$6,555.15 <br />$6,555.15 <br />$6,555.15 <br />100.00 <br />$0.00 <br />01005.44 <br />COP#41 - Fill Station in Garage <br />$2,586.97 <br />$2,586.97 <br />$2,586.97 <br />100.00 <br />$0.00 <br />01005.45 <br />COP#42- Additional Gale in Aeration Basin Trough <br />$3,984.75 <br />$0.00 <br />$3,984.75 <br />$3,984.75 <br />100.00 <br />$0.00 <br />01005.46 <br />COP#43 - Check Valves for Screw Press Drains <br />$3,742.25 <br />$3,742.25 <br />$3,742.25 <br />100.00 <br />$0.00 <br />0100547 <br />COP#44- Lab Casework Revisions <br />$1,407.19 <br />$000 <br />$1,407.19 <br />$1,407.19 <br />100.00 <br />$0.00 <br />01005.48 <br />COP#45- Aeration Basin Bug Growth <br />$31,177.25 <br />$0.00 <br />$0.00 <br />0.00 <br />$31,177.25 <br />0100549 <br />COP#46-Sludge Removal <br />$21,653.65 <br />$0.00 <br />$0.00 <br />0.00 <br />$21,653.65 <br />0100550 <br />COP#47- Conduit for City Fiber <br />$7,329.24 <br />$7,32924 <br />$7,329.24 <br />100.00 <br />$0.00 <br />01005.51 <br />COP#48- Additional Fiber Runs <br />$0.00 <br />$0.00 <br />$0.00 <br />#DIV/01 <br />$0.00 <br />0100552 <br />COP#49- Ops Building Roof <br />$5,300.00 <br />$5,300.00 <br />$5,300.00 <br />100.00 <br />$0.00 <br />01005.53 <br />COP#50- Rapid Mixer SupporlslBaHles <br />$19.455.08 <br />$0.00 <br />$19,455.08 <br />$19,455.08 <br />100.00 <br />$0.00 <br />01005.54 <br />COP#51 -Electrical Changes in Ops Bldg <br />$23,398.78 <br />$0.00 <br />$23,398.78 <br />$23,398.78 <br />100.00 <br />$0.00 <br />01005.55 <br />COP#52-AC in ITRoom <br />$9,596.73 <br />$000 <br />$9,596.73 <br />$9,596.73 <br />100.00 <br />$0.00 <br />01005.56 <br />COP#53 - Ceiling Fan in Biosoilds Bldg #2 <br />$3,216.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,216.00 <br />01005.57 <br />COP#54- Additional Window in Ops Bldg <br />$1,281.00 <br />$0.00 <br />$1,281.00 <br />$1,281.00 <br />100.00 <br />$0.00 <br />01005.58 <br />COP#55- Concrete Curb on Bicsoilds Bldg#1 Roof <br />$6,204.83 <br />$0.00 <br />$6,204.83 <br />$6,204.83 <br />100.00 <br />$0.00 <br />01005.59 <br />COP#56- Additional IT Equipment <br />$19,039.86 <br />$0.00 <br />$0.00 <br />0.00 <br />$19,039.86 <br />01005.60 <br />COP#57- Access Control Rough4n <br />$18,644.88 <br />$0.00 <br />$0.00 <br />0.00 <br />$18,644.88 <br />01005.61 <br />COP#58- HVAC in Siosolids Bldg#1 <br />$31,243.40 <br />$0.00 <br />$15.621.20 <br />$15,621.20 <br />50.00 <br />$15,622.20 <br />02060 <br />Demolition of Existing Facilkies/Povement <br />02060.1 <br />-Main Building <br />$40,000.00 <br />$40,000.00 <br />$40,000.00 <br />100.00 <br />$0.00 <br />02060.2 <br />-Blower Building <br />$15,000.00 <br />$15,000.00 <br />$15,000.00 <br />100.00 <br />$0.00 <br />02060.3 <br />-Aeration Tank <br />$20,000.00 <br />$20,000.00 <br />$20,000.00 <br />100.00 <br />$0.00 <br />02060.4 <br />- Tncklmg Filters & Pump Station <br />$45,000.00 <br />$45,000.00 <br />$45,000.00 <br />100.00 <br />$0.00 <br />02060.5 <br />- Final Clarifier Sludge Wel Well <br />$10,000.00 <br />$10,000.00 <br />$10,000.00 <br />100.00 <br />$0.00 <br />02060.6 <br />-Pavement <br />$10,510.00 <br />$10,510.00 <br />$10,510.00 <br />100.00 <br />$0.00 <br />02140 <br />Bypass Pumping <br />$75,000.00 <br />$75,000.00 <br />$75,000.00 <br />100.00 <br />$0.00 <br />02220 <br />Earthwork <br />F722iF777 <br />- Nev, Aeration Basins <br />$355,815.00 <br />$355,815.00 <br />$355,815.00 <br />100.00 <br />Page 3 of 7 <br />