Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: Cityof Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton 8 Mark, Inc. <br />Application Number 24 <br />Date of application 10/31/2016 <br />Work completed through: 10/31/2016 <br />Page 2 of 7 <br />Rem <br />B <br />C D <br />E <br />Total Completed <br />% <br />Balance to <br />Pay Item <br />Number <br />Description <br />Scheduled Value <br />From Previous This Period <br />Application (G-0) <br />Materials Presently <br />Stored (not in C01 D) <br />and Stored to Dale <br />(C + D t E) <br />(F) <br />Finish <br />01001 <br />Performance Bond <br />$230,186.00 <br />$230,186.00 <br />$230,186.00 <br />100.00 <br />$0.00 <br />01002 <br />Insurance <br />$161,171.00 <br />$161,171.00 <br />$161,171.00 <br />100.00 <br />$0.00 <br />01003 <br />Mobilization <br />$635,418.00 <br />$635,418.00 <br />$635,418.00 <br />100.00 <br />$0.00 <br />01004 <br />Demobllumbon <br />$30.000.00 <br />$0.00 <br />$000 <br />0.00 <br />$30,000.00 <br />01005 <br />Project Allowances <br />$192,147.61 <br />$0.00 <br />$0.00 <br />0.00 <br />$192,147.61 <br />01005.1 <br />jSubnniftal Exchange <br />$9,795.00 <br />$9,795.00 <br />$9,795.00 <br />100.00 <br />$0.00 <br />01005.2 <br />Building Permit <br />$29,530.04 <br />$29,530.04 <br />$29,53004 <br />100.00 <br />$0.00 <br />01005.3 <br />Lift Station SCADA System Allowance <br />$230,000.00 <br />$242,268.59 <br />$242,268.59 <br />105.33 <br />$0.00 <br />01005.4 <br />COP#01- Automatic Door Operators <br />$5,963.20 <br />$5,963.20 <br />$5,963.20 <br />100.00 <br />$0.00 <br />01005.5 <br />COP#02- Overflow for Biosolids Holding Tank <br />$2,787.42 <br />$2,787.42 <br />$2,787.42 <br />100.00 <br />$0.00 <br />01005.6 <br />COP#03- Additional Window in Door 1128 <br />$323.84 <br />$323.84 <br />$323.84 <br />100.00 <br />$0.00 <br />01005.7 <br />COP#04-Delay Costs <br />IN C0I BELOW <br />01005.8 <br />COP#05-Revised Plans <br />$49,509.90 <br />$49,509.90 <br />$49,509.90 <br />100.00 <br />$0.00 <br />01005.9 <br />COP#06-Black Material <br />$106,703.90 <br />$106,703.90 <br />$106,703.90 <br />100.00 <br />$0.00 <br />01005.10 <br />COP#07-Slide Gate 16 <br />$5,361.91 <br />$5,361.91 <br />$5,361.91 <br />100.00 <br />$0.00 <br />01005.11 <br />COP#08- Aeration Basin Sumps <br />$10,693.54 <br />$10,693.54 <br />$10,693.54 <br />100.00 <br />$0.00 <br />01005.12 <br />COP#09 - Biosolids OH Doors <br />$37,350.46 <br />$37,350.46 <br />$37,350.46 <br />100.00 <br />Soon <br />01005.13 <br />COP#10- Aeration Pipe Drop Legs <br />($3.50000) <br />($3,500.80) <br />($3,500.80) <br />100.00 <br />$0.00 <br />01005.14 <br />COP#11-Viton Gaskets <br />$11,424.54 <br />$11,424.54 <br />$11,424.54 <br />100.00 <br />$000 <br />01005.15 <br />COP#12- Supernatant MH Vent <br />$3,686.92 <br />$3.686.92 <br />$3,686.92 <br />100.00 <br />$000 <br />01005.16 <br />COP#13- Disinfection Channel Gate <br />($1,500.00) <br />($1,500.00) <br />($1,500.00) <br />100.00 <br />$0.00 <br />01005.17 <br />COP#14-Washer/Dryer Hookups <br />$3,515.73 <br />$3,515.73 <br />$3,515.73 <br />100.00 <br />$0.00 <br />01005.18 <br />COP#15-Dumpster Rails <br />$20,796.71 <br />$20,796.71 <br />$20,796.71 <br />100,001 <br />$0.00 <br />01005.19 <br />COP#16-Retaining Wall <br />$10,236.72 <br />$10,236.72 <br />$10,236.72 <br />0.00 <br />$0.00 <br />01005.20 <br />COP#17- Additional Hydrant B Paving <br />$10,437.29 <br />$10,437.29 <br />$10,437.29 <br />100.00 <br />$0.00 <br />01005.21 <br />COP#18-Meter Manhole <br />$17,695.94 <br />$17,695.94 <br />$17,695.94 <br />100.00 <br />$0.00 <br />01005.22 <br />COP#19-LS Stairs <br />($9,420.00) <br />($9,420.00) <br />($9,420.00) <br />100.00 <br />$0.00 <br />01005.23 <br />COP#20-Yard Hydrants <br />$6,169.00 <br />$6,169.00 <br />$6,169.00 <br />100.00 <br />$0.00 <br />01005.24 <br />COP#21- Seal Fail Modules <br />$5,125.94 <br />$5,125.94 <br />$5,125.94 <br />100.00 <br />$0.00 <br />01005.25 <br />COP#22-Sand Filler Roof <br />$1,802.00 <br />$1,802.00 <br />$1,802.00 <br />100.00 <br />$0.00 <br />01005.26 <br />COP#23- Aeration Basin Lights <br />$4,167.00 <br />$4,167.00 <br />$4,167.00 <br />100.00 <br />$0.00 <br />01005.27 <br />COP#24-Lockers <br />$0.00 <br />$0.00 <br />$0.00 <br />#31V/01 <br />$0.00 <br />01005.28 <br />COP#25 - Parapet at RASANAS Bldg <br />$861.00 <br />$861.00 <br />$861.00 <br />100.00 <br />$0.00 <br />01005.29 <br />COP#26-Field Order 19 <br />$4,996.90 <br />$4,996.90 <br />$4,996.90 <br />100.00 <br />$0.00 <br />01005.30 <br />COP#27-Field Order 20 <br />$5,255.62 <br />$5,255.62 <br />$5,25502 <br />100.00 <br />$0.00 <br />01005.31 <br />COP#28-Fieltl Order 22 <br />$11,637.96 <br />$11,637.96 <br />$11,637.96 <br />100.00 <br />$0.00 <br />01005.32 <br />COP#29-Field Order 23 <br />$10,217.14 <br />$10,217.14 <br />$10,217.14 <br />100.00 <br />$0.00 <br />01005.33 <br />JCOP#30-Field Order 26 <br />$22,043.011 <br />$22,041011 <br />$22,043.01 <br />100.00 <br />Page 2 of 7 <br />