My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 11-21-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
11-21-2016
>
4.3. SR 11-21-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 1:17:48 PM
Creation date
11/17/2016 1:06:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/21/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL PAYMENT <br />CITY OF ELK RIVER <br />Natures Edge Business Center - Phase 2 Improvements <br />Bid Schedule "B" - Storm Sewer <br />ITEM <br />NO. <br />I ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />34 <br />BULKHEAD <br />6 <br />EACH <br />$85.00 $ <br />510.00 <br />6 <br />$ 510.00 <br />35 <br />24" RC PIPE CULVERT CLASS III <br />168 <br />LIN FT <br />$28.50 $ <br />4,788.00 <br />184 <br />$ 5 244.00 <br />36 <br />15" RC PIPE APRON <br />4 <br />EACH <br />$570.00 <br />2280.00 <br />4 <br />$ 2280.00 <br />37 <br />24" RC PIPE APRON <br />2 <br />EACH <br />$675.00 IS <br />1,350.00 <br />2 <br />$ 1,350.00 <br />38 <br />36" RC PIPE APRON <br />1 <br />EACH <br />$1,0013.00 IS <br />1,000.00 <br />1 <br />$ 1,000.00 <br />39 <br />TRASH GUARD FOR 36" PIPE APRON <br />1 <br />EACH <br />$425.00 $ <br />425.00 <br />1 <br />$ 425.00 <br />40 <br />30" PERF CP PIPE SEWER <br />209 <br />LIN FT <br />$78.00 $ <br />16 302.00 <br />209 <br />$ 16 302.00 <br />41 <br />36" PERF CP PIPE SEWER <br />1,160 <br />LIN FT <br />$90.00 $ <br />104400.00 <br />1159 <br />$ 104310.00 <br />42 <br />15" RC PIPE SEWER DESIGN 3006 CL V <br />536 <br />LIN FT <br />$27.00 $ <br />14 472.00 <br />526 <br />$ 14202 .00 <br />43 <br />18" RC PIPE SEWER DESIGN 3006 CL III <br />91 <br />LIN FT <br />29.50 $ <br />2,684,50 <br />99 <br />$ 2 920.50 <br />44 <br />36" RC PIPE SEWER DESIGN 3006 CL III <br />217 <br />LIN FT <br />61.50 <br />13,3 5.50 <br />215 <br />$ 13 222.50 <br />45 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL POND OUTLET <br />2 <br />EACH <br />$3,000.00 $ <br />6,000.00 <br />2 <br />$ 6 000.00 <br />46 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 484020 <br />36.6 <br />LIN FT <br />$295.00 $ <br />10 797.00 <br />36.55 <br />$ 10 782.25 <br />47 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 604020 <br />96.4 <br />LIN FT <br />$248.00 $ <br />23 907.20 <br />84.05 <br />$ 20 844.40 <br />48 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 724020 <br />23.2 <br />LIN FT <br />$340.00 IS <br />7868.00 <br />36.79 <br />$ 12508.60 <br />49 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 844020 <br />21.3 <br />LIN FT <br />$620.00 $ <br />13 206.00 <br />21.31 <br />13 212.20 <br />50 <br />CASTING ASSEMBLY <br />21 <br />EACH <br />$650.00 $ <br />13650.00 <br />21 <br />13650.00 <br />51 <br />RANDOM RIPRAP CLASS IV <br />9.9 <br />CU YD <br />$71.00 $ <br />702.90 <br />13.9 <br />$' 986.90 <br />Total Bid Schedule "B" $ 237.708.10 $ 239.750.35 <br />Bid Schedule "C" - Sanitary Sewer <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />52 <br />WELDED STEEL PIPE -JACKED <br />54 <br />LIN FT <br />$585.00 $ <br />31590.00 <br />54 <br />IS 37590.00 <br />53 <br />8" PVC PIPE SEWER SDR 35 <br />340 <br />LIN FT <br />$27.00 IS <br />9,180.00 <br />340 <br />$ 9180.00 <br />54 <br />12" PVC PIPE SEWER SDR 35 <br />1,645 <br />LIN FT <br />$34.00 IS <br />55 930.00 <br />1,632 <br />$ 55 488.00 <br />55 <br />6" PVC PIPE PLUG - SEWER <br />5 <br />EACH <br />$35.00 IS <br />175.00 <br />5 <br />$ 175.00 <br />56 <br />8" PVC PIPE PLUG - SEWER <br />2 <br />EACH <br />$52.00 $ <br />104.00 <br />2 <br />IS 104.00 <br />57 <br />12" PVC PIPE PLUG -SEWER <br />i <br />EACH <br />$111.00 $ <br />111.00 <br />1 <br />$ 111.00 <br />58 <br />CONNECT TO EXISTING SANITARY SEWER <br />i <br />EACH <br />$1,350,001$ <br />1.350.00 <br />1 <br />$ 1,350.00 <br />59 <br />6" PVC SANITARY SERVICE PIPE SDR 26 <br />284 <br />LIN FT <br />$25.00 S <br />7100.00 <br />284 <br />$ 7100.00 <br />60 <br />CLEAN AND VIDEOTAPE PIPE SEWER <br />1,985 <br />LIN FT <br />$1.25 $ <br />2,481.25 <br />1,972 <br />$ 2,46&00 <br />61 <br />CONSTRUCT SANITARY STRUCTURE DESIGN 484007 0-12' <br />8 <br />EACH <br />$2,165.00 <br />17 320.00 <br />8 <br />$ 17 320.00 <br />62 <br />CONSTRUCT EXTRA DEPTH SANITARY STRUCTURE >12' <br />35.3 <br />LIN FT <br />$88.00 <br />3,106.40 <br />35.33 <br />$ 3,109.04 <br />63 <br />CASTING ASSEMBLY <br />8 <br />EACH <br />$830.00 $ <br />6640.00 <br />8 <br />$ 6640.00 <br />Total Bid Schedule "C" $ 135.087.66 S 134.632.04 <br />Bid Schedule "D" - Watermain <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />64 <br />DUCTILE IRON FITTINGS <br />4600 <br />POUND <br />$2.80 $ <br />12 880.00 <br />4,556 <br />$ <br />12756.80 <br />65 <br />6" WATERMAIN DUCTILE IRON CL 52 <br />55 <br />LIN FT <br />28.00 $ <br />1.540.00 <br />53 <br />$ <br />1,484,00 <br />66 <br />8" WATERMAIN DUCTILE IRON CL 52 <br />549 <br />LIN FT <br />$33.00 $ <br />18 117.00 <br />568 <br />$ <br />18 744.00 <br />67 <br />12" WATERMAIN DUCTILE IRON CL 52 <br />980 <br />LIN FT <br />$43.50 $ <br />42 630.00 <br />980 <br />$ <br />42 630.00 <br />68 <br />16" WATERMAIN DUCTILE IRON CL 52 <br />645 <br />LIN FT <br />61.00 $ <br />39 345.00 <br />650 <br />$ <br />39 650.00 <br />69 <br />6" GATE VALVE AND BOX <br />4 <br />EACH <br />$1,135.00. $ <br />4.54D.00 <br />4 <br />$ <br />4 540.00 <br />70 <br />8" GATE VALVE AND BOX <br />10 <br />EACH <br />$1.645.00 IS <br />16 450.00 <br />9 <br />$ <br />14 805.00 <br />71 <br />12" BUTTERFLY VALVE AND BOX <br />1 <br />EACH <br />$1,930.00 $ <br />1 930.00 <br />1 <br />$ <br />7 930.00 <br />72 <br />16" BUTTERFLY VALVE AND BOX <br />2 <br />EACH <br />$2,750.00 $ <br />5,500.00 <br />2 <br />5,500.00 <br />73 <br />CONNECT TO EXISTING WATERMAIN <br />1 <br />EACH <br />$3000.00 $ <br />3000.00 <br />1 <br />$ <br />3000.00 <br />74 <br />HYDRANT <br />5 <br />EACH <br />$3:500!00 $ <br />17 500.00 <br />4 <br />14 000.00 <br />75 <br />HYDRANT EXTENSION <br />10 <br />LIN FT <br />$620.00 $ <br />6,200.00 <br />9.5 <br />$ <br />5,890.00 <br />Total Bid Schedule "D" <br />SAMunicipaMe1kriver1ER302Nay Estimates\ER302 PE PE - 2 <br />S 169.632.00 $ 164.929.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.