My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 11-07-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
11-07-2016
>
8.2. SR 11-07-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2016 2:41:44 PM
Creation date
11/4/2016 10:24:39 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/7/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Is this project a subsequent stage of an earlier project? ❑Yes ❑No <br /> If yes, briefly describe the past development,timeline and any past environmental review. <br /> (The Site is immediately adjacent to the Elk River Gravel Mining District. An Environmental <br /> Impact Statement was completed for the Elk River Gravel Mining District in 1994. Much of the <br /> information for that EIS is relevant to the proposed Project.) <br /> 7. Cover types: Estimate the acreage of the site with each of the following cover types before and <br /> after development: <br /> Before After Before After <br /> Wetlands 0 0 Lawn/landscaping 0.5 0 <br /> Deep 0 20 Impervious surface 1.5 0 <br /> water/streams <br /> Wooded/forest 25 0 Stormwater Pond 0 0 <br /> Brush/Grassland 112 119 Other (describe) <br /> Cropland 0 0 Baldwin Street R-O-W 3 3 <br /> TOTAL 142 142 <br /> 8. Permits and approvals required: List all known local, state and federal permits, approvals, <br /> certifications and financial assistance for the project. Include modifications of any existing <br /> permits, governmental review of plans and all direct and indirect forms of public financial <br /> assistance including bond guarantees, Tax Increment Financing and infrastructure. All of these <br /> final decisions are prohibited until all appropriate environmental review has been completed. See <br /> Minnesota Rules, Chapter 4410.3100. <br /> Unit of Government Type of Application Status <br /> City of Elk River Zone Amendment To be applied for <br /> City of Elk River Mining CUP To be applied for <br /> City of Elk River Parcel Split To be applied for <br /> City of Elk River Annual Mineral Excavation License To be applied for <br /> MPCA Air Emission General Permit Obtained <br /> MPCA NPDES General Permit Obtained <br /> MNDNR Water Appropriations Permit To be applied for <br /> MDH Well Construction Permit To be applied for if needed <br /> Fuel storage tanks with a capacity of over 1,100 gallons and over 500 feet from a Class 2 surface <br /> water or over 500 gallons and within 500 feet of a Class 2 surface water will be registered with the <br /> MPCA. <br /> Cumulative potential effects may be considered and addressed in response to individual EAW <br /> Item Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item <br /> No. 19. If addressing cumulative effect under individual items, make sure to include information <br /> requested in EAW Item No. 19 <br /> Environmental Assessment Worksheet Page 6 <br /> Elk River Sand and Gravel Mines:Tiller Corporation and Max Steininger, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.