My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 10-17-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
10-17-2016
>
4.5. SR 10-17-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 10:01:41 AM
Creation date
10/14/2016 9:50:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />expense of the Contractor. <br /> <br />• 1.03.09 Discharge, release or spill on the Railway Property of any hazardous <br />substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous <br />waste is prohibited and Contractor must immediately notify the Railway's Resource <br />Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess <br />of a reportable quantity. Contractor must not allow Railway Property to become a <br />treatment, storage or transfer facility as those terms are defined in the Resource <br />Conservation and Recovery Act or any state analogue. <br /> <br />• 1.03.10 The Contractor upon completion of the work covered by this contract, <br />must promptly remove from the Railway's Property all of Contractor's tools, <br />equipment, implements and other materials, whether brought upon said property by <br />said Contractor or any Subcontractor, employee or agent of Contractor or of any <br />Subcontractor, and must cause Railway's Property to be left in a condition <br />acceptable to the Railway's representative. <br /> <br /> <br />1.4 Contractor Roadway Worker on Track Safety Program and Safety <br />Action Plan: <br /> <br />• 1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a <br />track must develop and implement a Roadway Worker Protection/On Track Safety <br />Program and work with Railway Project Representative to develop an on track safety <br />strategy as described in the guidelines listed in the on track safety portion of the <br />Safety Orientation. This Program must provide Roadway Worker protection/on track <br />training for all employees of the Contractor, its subcontractors, agents or invitees. <br />This training is reinforced at the job site through job safety briefings. Additionally, <br />each Contractor must develop and implement the Safety Action Plan, as provided for <br />on the web site www.contractororientation.com, which will be made available to <br />Railway prior to commencement of any work on Railway Property. During the <br />performance of work, the Contractor must audit its work activities. The Contractor <br />must designate an on-site Project Supervisor who will serve as the contact person <br />for the Railway and who will maintain a copy of the Safety Action Plan, safety audits, <br />and Material Safety Datasheets (MSDS), at the job site. <br /> <br />• 1.04.02 Contractor shall have a background investigation performed on all of its <br />employees, subcontractors and agents who will be performing any services for <br />Railroad under this Agreement which are determined by Railroad in its sole <br />discretion a) to be on Railroad’s property, or b) that require access to Railroad <br />Critical Infrastructure, Railroad Critical Information Systems, Railroad’s Employees, <br />Hazardous Materials on Railroad’s property or is being transported by or otherwise <br />in the custody of Railroad, or Freight in Transit involving Railroad.
The URL can be used to link to this page
Your browser does not support the video tag.