<br /> <br /> <br /> <br />• 1.03.03 The Contractor must abide by the following temporary clearances during <br />construction: <br /> <br /> 15’-0” Horizontally from centerline of nearest track <br /> 21’-6” Vertically above top of rail <br /> 27'-0" Vertically above top of rail for electric wires carrying less than 750 <br />volts <br /> 28'-0" Vertically above top of rail for electric wires carrying 750 volts to <br />15,000 volts <br /> 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to <br />20,000 volts <br /> 34'-0" Vertically above top of rail for electric wires carrying more than <br />20,000 volts <br /> <br />• 1.03.04 Upon completion of construction, the following clearances shall be <br />maintained: <br /> 25’ Horizontally from centerline of nearest track <br /> 23’ 6” Vertically above top of rail <br /> <br />• 1.03.05 Any infringement within State statutory clearances due to the Contractor's <br />operations must be submitted to the Railway and to the (Agency) and must not be <br />undertaken until approved in writing by the Railway, and until the (Agency) has <br />obtained any necessary authorization from the State Regulatory Authority for the <br />infringement. No extra compensation will be allowed in the event the Contractor's <br />work is delayed pending Railway approval, and/or the State Regulatory Authority's <br />approval. <br /> <br />• 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will <br />have the option of installing tell-tales or other protective devices Railway deems <br />necessary for protection of Railway operations. The cost of tell-tales or protective <br />devices will be borne by the Agency. <br /> <br />• 1.03.07 The details of construction affecting the Railway's Property and tracks not <br />included in the contract plans must be submitted to the Railway by (Agency) for <br />approval before work is undertaken and this work must not be undertaken until <br />approved by the Railway. <br /> <br />• 1.03.08 At other than public road crossings, the Contractor must not move any <br />equipment or materials across Railway's tracks until permission has been obtained <br />from the Railway. The Contractor must obtain a "Temporary Construction Crossing <br />Agreement" from the Railway prior to moving his equipment or materials across the <br />Railways tracks. The temporary crossing must be gated and locked at all times when <br />not required for use by the Contractor. The temporary crossing for use of the <br />Contractor will be constructed and, at the completion of the project, removed at the