Laserfiche WebLink
Change Order 3 OWNER City of Elk River <br /> LANDSCAPE ARCHITECT Hoisington Koegler Group inc. <br /> CONTRACTOR Sunrarn Construction <br /> THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS <br /> COMPLETION OR MODIFICATION. <br /> PROJECT: <br /> Elk River-Rivers Edge Park Expansion CHANGE ORDER NUMBER: 3 <br /> DATE: 9,2'0.16 <br /> PROJECT NO: HKGl 015-032 <br /> TO CONTRACTOR: CONTRACT DATE: 4.,22.16 <br /> Sunrarn Construction <br /> 20010 75th Ave N,Corcoran,MIN 55340 <br /> The Contract is changed as follows: (see sheet 2) <br /> Not valid until signed by the Owner,Landscape Architect and Contractor. <br /> The ohginaI(Contract Sum)was $ 301,854,010 <br /> Net change by previously authorized Change Orders $ 58,450.00 <br /> The(Contract Sum)prior to this Change Order was $ 360,304.00 <br /> The(Contract Sum) will be,-CHANGED by the Change Order in the amount of $ 13,3:15:0:0] <br /> The new(Contract Sum) including this Change Order wifl be $ 373,619.00 <br /> This Change Order DOES NOT EFFECT Contract Time <br /> The date of Substantial Completion as of the date of this Change Order therefore is 10.3,0.16 <br /> LANDSCAPE ARCHITECT CONTRACTOR OWNER <br /> Hoisington Koegler Group inc. Sunram Construction City of Elk River <br /> 123 North 3rd Street,Suite 100 20010 75th Ave N,Corcoran,MN 55340 13065 Orono Parkway,EN River,MIN 55330 <br /> Minneapolis,Minnesota 55401 <br /> (Pnn!Rame) (print name) (print name) <br /> (signature and date) (signature and date) (signature and date) <br /> page 1 of 2 <br />