Laserfiche WebLink
Summaof Change Order No.3 - 9.20.16 <br /> You are directed to make the following changes in the Contract Documents., <br /> Descriptions: Unit Qty UnitCost Total <br /> 1. Eliminate bid item: <br /> CONSTRUCTION NEW ST MH LS -1 $ 5,800,00 $ (5,800.00) <br /> OVER EXISTING PIPE <br /> 2.ADD 12" HDPE PIPE LF 70 $ 39.00 $ 2,730.00 <br /> 3. CB#5,at lower parking lot <br /> Replace,inadequate MH with new <br /> 60"includes removal of existing MH <br /> #5 and installation of a new 60-4020 LS 1 $ 17,000.00, $ 17,000.00 <br /> CBMH with a 4'sump, 3067V <br /> casting and a Snout Skimmer/BMP <br /> device. <br /> 4, Bid item qty changes estimated for alley grade changes for CB#3 relocation(final will measure infield) <br /> a. CURB REMOVAL LF 10 $ 7,50 $ 75.00 <br /> b. NEW CURB LF 10 $ 31.00 $ 310.00 <br /> 5. Eliminate bid item: ROCK <br /> CONSTRUCTION ENTRANCE LS -1 $ 1,0001.00 $ (1,000m) <br /> Net Contract change for Change Order $ 13,315.00 <br /> page 2 of 2 <br />