My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 10-03-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
10-03-2016
>
4.5. SR 10-03-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2016 12:09:36 PM
Creation date
9/30/2016 11:54:59 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eclty1� ,.,�� Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 4.5 <br /> Agenda Section Meeting Date Prepared by <br /> Consent October 3,2016 Michael Hecker, Parks and Recreation Director <br /> Item Description Reviewed by <br /> Rivers Edge Commons Park Construction Change Cal Portner, City Administrator <br /> Order Reviewed by <br /> Action Requested <br /> Approve,by motion, change order requests for the construction of the Rivers Edge Commons Park <br /> Expansion. <br /> Background/Discussion <br /> After Sunram Construction conducted demolition of the old alleyway to the lower parking lot,it was <br /> discovered that due to the number of utilities below the alley the proposed stormwater plan needed to be <br /> modified. <br /> The proposed design included new stormwater services in the alleyway and connecting into the existing <br /> stormwater infrastructure. Due to the utilities,it was determined that this design could not be conducted <br /> without substancial relocation of the existing utilities. <br /> HKGi and Sunram proposed and alternate design redirecting the stormwater through the upper parking <br /> lot. Additionally,it was determined that the existing manhole and sump was undersized and highly <br /> degraded and required replacement in order to adequately meet the expected discharge of water from the <br /> alley and upper parking lot. This redesign included additional pipe,upgrading the existing manhole to a <br /> 60 inch sump and adding a skimmer device. <br /> The change order amount will be $13,315.00 that will be paid for from contingency and the stormwater <br /> fund. <br /> Financial Impact <br /> There is no impact to the city General Fund. <br /> Attachments <br /> ■ Change Order <br /> POWERED 6T <br /> AR <br />
The URL can be used to link to this page
Your browser does not support the video tag.