Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer Bolton & Monk, Inc. <br />Application Number <br />Date of application 613112016 <br />Work Completed through: 613112016 <br />Pay Item <br />Number <br />Item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E <br />This Period Materials Presently <br />Stored (not in Col D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />% <br />U <br />Balance to <br />Finish <br />11636 <br />Phosphorus Analyzer <br />11636.1 <br />-Purchase <br />$26,000.00 <br />$16,500.00 <br />$8,200.00 <br />$24,700.00 <br />95.00 <br />$1,300-00 <br />11636.2 <br />-Install <br />$5,000.00 <br />$0.00 <br />$5,000.00 <br />$5,000,00 <br />100,00 <br />$0.00 <br />12346 <br />Casework/Lab Eq. <br />$45,000.00 <br />$4,000.00 <br />$4,000.00 <br />8.89 <br />$41,000.00 <br />13126 <br />Circular Tank Covers <br />13126.1 <br />-Purchase <br />$292,837-00 <br />$0.00 <br />$0.00 <br />0.00 <br />$292,837.00 <br />13126.2 <br />-Install <br />$75,00000 <br />$0.00 <br />$0.00 <br />0.00 <br />$75,000-00 <br />14300 <br />Hoists & Cranes <br />143001 <br />-Purchase <br />$40,000.00 <br />$0,00 <br />$0.00 <br />0.00 <br />$40,000.00 <br />14300.2 <br />-Install <br />$12,000.00 <br />$0.0o <br />$0.00 <br />0.00 <br />$12,000.00 <br />14500 <br />Material Handling Equipment <br />14500.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />14500.2 <br />4nstall <br />$2,500.00 <br />$0.00 <br />$Q.00 <br />000 <br />$2,500,00 <br />14600 <br />Conveyance Equipment <br />14600.1 <br />-Purchase <br />$135,000.00 <br />$135,000.00 <br />$135,000.00 <br />100.00 <br />$0.00 <br />14600.2 <br />-Install <br />$22,250.00 <br />$22,250.00 <br />$22,250.00 <br />100,00 <br />$0.00 <br />14621 <br />Power Winch <br />14621.1 <br />-Purchase <br />$20,000.00 <br />$20,000.00 <br />$20,000-00 <br />100.00 <br />$0-00 <br />14621.2 <br />-Install <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />100.00 <br />$0.00 <br />15060 <br />Process Piping <br />15060,1 <br />-Purchase <br />$650,000.00 <br />$614,000.00 <br />$614,000.00 <br />94.46 <br />$36,000.00 <br />15060.2 <br />-Install <br />$200,000,00 <br />$187,500.00 <br />$187,500.00 <br />93.75 <br />$12,500.00 <br />16100 <br />Valves <br />15100.1 <br />-Purchase <br />$265,000.00 <br />$265,000.00 <br />$265,000.00 <br />100.00 <br />$0.00 <br />15100.2 <br />-Install <br />$110,000.00 <br />$93,000,00 <br />$93,000.00 <br />84.55 <br />$17,000.00 <br />16300 <br />Fire Protection <br />$45,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$45,000.00 <br />16400 <br />Plumbing <br />15400.1 <br />-Copper Piping <br />15400.1 .1 <br />-Purchase <br />$45,000.00 <br />$36,250.00 <br />$36,250.00 <br />80.56 <br />$8,750.co <br />15400.1.2 <br />-Install <br />$1o0,o00.00 <br />$84,00000 <br />$84,000,00 <br />84,00 <br />$16,000,00 <br />15400.2 <br />-Chemical Piping <br />15400.2 ,1 <br />-Purchase <br />$18,000.00 <br />$12,000.00 <br />$6,000.00 <br />$18,000.00 <br />100.00 <br />$0,00 <br />15400,2.2 <br />-Install <br />$22,000.00 <br />$14,000.00 <br />$8,000 00 <br />$22,000-00 <br />100.00 <br />$0.00 <br />15400.3 <br />-Waste & Vent Piping <br />Page 6 of 7 <br />