Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River Application Number 19 <br />Contractor: Rice Lake Construction Group Date of application 5/3112016 <br />Engineer: Bolton & Menk, Inc. Work completed through: 513112016 <br />Pay Item <br />Number <br />item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D <br />This Period <br />E <br />Materials Presently <br />Stored (not in Col D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />% <br />(F) <br />Balance to <br />Finish <br />15400.3.1 <br />-Purchase <br />$30,000.00 <br />$27,000.00 <br />3327,000.00 <br />90.00 <br />$3,000.00 <br />15400.3.2 <br />-Install <br />$62,000.00 <br />$55,800.00 <br />$55,800.00 <br />90.00 <br />$6,200.00 <br />16480 <br />JPackaged Compressed Air System <br />15480.1 <br />-Purchase <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />100.00 <br />$0.00 <br />15480.2 <br />-install <br />$1,500.00 <br />$1,500.00 <br />$1,500.00 <br />100.00 <br />$0.00 <br />16500 <br />HVAC <br />15500.1 <br />Equipment <br />$286,200.00 <br />$177,227.50 <br />$177,227.50 <br />61.92 <br />$108,972.50 <br />15500.2 <br />Labor <br />$169,020.00 <br />$80,874.00 <br />$80,874.00 <br />47.85 <br />$88,146.00 <br />15500.3 <br />Duct Insulation <br />$24,780.00 <br />$4,460.40 <br />$4,460.40 <br />18.00 <br />$20,319,60 <br />15500.4 <br />Test & Balance <br />$5,000.00 <br />$0,00 <br />$1,500-00 <br />$1,500.00 <br />30.00 <br />$3,500.00 <br />15950 <br />HVAC Controls <br />$67,400.00 <br />$32,000.00 <br />$32,000.00 <br />47.48 <br />$35,400.00 <br />16000 <br />Electrical <br />16000.1 <br />General Provisions <br />$55,000.00 <br />$42,680.00 <br />$2,600.00 <br />$45,280.00 <br />82.33 <br />$9,720.00 <br />16000,2 <br />Basic Materials and Methods <br />$265,000.00 <br />$180,320.00 <br />$4,900.00 <br />$185,220.00 <br />69.89 <br />$79,780.00 <br />16000.3 <br />Motors <br />$32,000.00 <br />$22,865.00 <br />$1,130,00 <br />$23,995.00 <br />74.98 <br />$8,005.00 <br />16000.4 <br />Power Generation System <br />$414,000.00 <br />$414,000.00 <br />$414,000.00 <br />100.00 <br />$0.00 <br />16000.5 <br />Electrical Distribution <br />$385,000.00 <br />$369,040.00 <br />$369,040.00 <br />95.85 <br />$15,960.00 <br />16000.6 <br />Lighting <br />$85,000.00 <br />$45,450.00 <br />$45,450.00 <br />53.47 <br />$39,550.00 <br />16000.7 <br />Special Systems <br />$24,000.00 <br />$9,960.00 <br />$800.00 <br />$10,760.00 <br />44.83 <br />$13,240.00 <br />16000.8 <br />Starters and MotorControi <br />$330,000.00 <br />$296,400.00 <br />$13,600.00 <br />$310,000.00 <br />93.94 <br />$20,000.00 <br />16000.9 <br />Instrumentation and Control <br />$480,000.00 <br />$418,550.00 <br />$4,400.00 <br />$422,950.00 <br />88.11 <br />$57,050.00 <br />Change Order No. 1 <br />$259,991.59 <br />$259,991.59 <br />$259,991.59 <br />100.00 <br />$0.00 <br />$16,785,191.59 <br />$13,663,648.47 <br />$236,347.36 <br />$om <br />$13,899,995.83 <br />82.81 <br />$2,885,195.76 <br />F,JCDC No. C-620 (2002 Edition) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications institute. <br />Page 7 of 7 <br />