Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Application Number <br />Date of application 513112016 <br />Work completed through: 513112016 <br />Pay Item <br />Number <br />Item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E <br />This Period Materials Presently <br />Stored (not in Col D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />% <br />(F) <br />Balance to <br />Finish <br />10505.2 <br />-Install <br />$4,000-00 <br />$0.00 <br />$0.00 <br />0-00 <br />$4,DOO.00 <br />11280 <br />Hydraulic Gates <br />11280.1 <br />-Purchase <br />$50,000.00 <br />$50,000.00 <br />$50,000,00 <br />100.001$0.00 <br />11280.2 <br />-Install <br />$20,000.00 <br />$20,000,00 <br />$20,000.00 <br />100100 <br />$0.00 <br />11311 <br />Submersible Centrifugal Pumps <br />11311.1 <br />-Purchase <br />$276,668.00 <br />$264,924.60 <br />$264,924.60 <br />95.00 <br />$13,943.40 <br />11311.2 <br />-Install <br />$25,000.00 <br />$22,500.00 <br />$22,500.00 <br />90.00 <br />$2,500.00 <br />11345 <br />Chlorination & Dechlorination Eq. <br />11345-1 <br />-Purchase <br />$330,000.00 <br />$273,386.25 <br />$40,113.75 <br />$313,500.00 <br />95.00 <br />$16,500,00 <br />11345.2 <br />-Install <br />$20,000.00 <br />$0.00 <br />$20,000.00 <br />$20,000.00 <br />100.00 <br />$0.00 <br />11351 <br />Clarifier Equipment <br />11351.1 <br />-Purchase <br />$15,000.00 <br />$13,507.74 <br />$1,492.26 <br />$15,000.00 <br />100.00 <br />$0.00 <br />11351.2 <br />-Install <br />$12,000.00 <br />$12,000.00 <br />$12,000.00 <br />100.00 <br />$0.00 <br />11366 <br />Screw Press <br />11356.1 <br />_Purchase <br />$575,000.00 <br />$575,000,00 <br />$575,000.00 <br />100.00 <br />$0.00 <br />11356.2 <br />-Install <br />$25,000,00 <br />$25,000.00 <br />$25,000.00 <br />100.00 <br />$0.00 <br />11374 <br />Fine Pore Aeration Equipment <br />11374.1 <br />-Purchase <br />$100,000.00 <br />$100,000.60 <br />$100,000.00 <br />100.00 <br />$0.00 <br />11374.2 <br />-Install <br />$75,000.00 <br />$50,000.00 <br />$50,000.00 <br />66.67 <br />$25,000.00 <br />11375 <br />Blower System (PD wlEnclosure) <br />11375.1 <br />-Purchase <br />$180,000.00 <br />$180,000.00 <br />$180,000.00 <br />100.00 <br />$0.00 <br />11375.2 <br />-Install <br />$30,000.00 <br />$15,000,00 <br />$15,000.00 <br />50.00 <br />$15,000.00 <br />11376 <br />Hybrid Blower System (Alt. No. 2) <br />11376.1 <br />-Purchase <br />$270,000.00 <br />$270,000.00 <br />$270,000.00 <br />100,00 <br />$0.00 <br />113762 <br />-install <br />$25,000.00 <br />$25,000.00 <br />$25,000,00 <br />100.00 <br />$0.00 <br />11385 <br />Coarse Bubble Aerobic Digester Mixing System <br />11385.1 <br />-Purchase <br />$65,000.00 <br />$61,750.00 <br />$61,750.00 <br />95.00 <br />$3,250.00 <br />11385.2 <br />-Install <br />$40,000.00 <br />$25,000-00 <br />$25,000.00 <br />62.50 <br />$15,000.00 <br />11386 <br />Rapid Mixers <br />11386.1 <br />-Purchase <br />$26,000.00 <br />$24,700.00 <br />$24,700.00 <br />95.00 <br />$1,300.00 <br />11386.2 <br />-Install <br />$3,500.00 <br />$3,500.00 <br />$3,500.00 <br />100-00 <br />$0.00 <br />11367 <br />Submersible Mixers <br />11387.1 <br />-Purchase <br />$75,000.00 <br />$71,250-00 <br />$71,250.00 <br />95.00 <br />$3,750.00 <br />11387.2 <br />-Install <br />$12,000,00 <br />$8,500.00 <br />$8,500.00 <br />7083 <br />$3,500,00 <br />Page 5 of 7 <br />