Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Application Number 19 <br />Date of application 5!3112016 <br />Work completed through: 513112016 <br />Pay Item <br />Number <br />Item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E Total Completed <br />This Period Materials Presently and Stared to Date <br />Stored (not in Col D) (C + D + E) <br />% <br />(F) <br />Balance to <br />Finish <br />03300 <br />Concrete Work <br />03300.1 <br />-Aeration Basin <br />$1,190,000.00 <br />$1,190,000.00 <br />$1,190,000.00 <br />100.00 <br />$0,00 <br />03300.2 <br />-RASIWAS Building <br />$215,000.00 <br />$215,000.00 <br />$215,000.00 <br />100.00 <br />$0.00 <br />03300.3 <br />-Aerated Biosolids Control Bldg No. 2 <br />$110,000.00 <br />$110,000.00 <br />$110,000-00 <br />100.00 <br />$0.00 <br />03300.4 <br />-Operations Building <br />$148,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$148,000.00 <br />03300.5 <br />-Generator & Transformer Pads <br />$20,000,00 <br />$20,000.00 <br />$20,000.00 <br />100.00 <br />$0.00 <br />03400 <br />Precast Walls & Plank <br />$1,062,500.00 <br />$871,250.00 <br />$871,250.00 <br />82-00 <br />$191,250.00 <br />04810 <br />Masonry <br />$75,000.00 <br />$75,000.00 <br />$75,000.00 <br />100.00 <br />$0.00 <br />05500 <br />Misc. Metals <br />05500.1 <br />-Purchase <br />$200,000.00 <br />$200,000.00 <br />$200,000,00 <br />100,00 <br />$0.00 <br />05500.2 <br />-Install <br />$95,000.00 <br />$95,000.00 <br />$95,000,00 <br />100.00 <br />$0.00 <br />06100 <br />Carpentry <br />06100.1 <br />-Purchase <br />$18,000.00 <br />$15,000.00 <br />$15,000.00 <br />83.33 <br />$3,000.00 <br />06100.2 <br />-Install <br />$22,000.00 <br />$16,000.00 <br />$16,000.00 <br />72.73 <br />$6,000.00 <br />07150 <br />Dampproofrng <br />$31,638.00 <br />$31,638.00 <br />$31,638.00 <br />100.00 <br />$0.00 <br />07535 <br />Roofing <br />$235,078.00 <br />$116,000.00 <br />$118,000.00 <br />50.20 <br />$117,078.00 <br />07900 <br />Caulking <br />$26,870.00 <br />$17,500.00 <br />$17,500.00 <br />65.13 <br />$9,370.00 <br />08110 <br />Doors & Frames <br />08110.1 <br />-Purchase <br />$57,780.00 <br />$40,000.00 <br />$40,000.00 <br />69.23 <br />$17,780.00 <br />08110,2 <br />-Install <br />$35,000.00 <br />$15,000.00 <br />$15,000.00 <br />42.86 <br />$20,000.00 <br />08360 <br />Upward Acting Sectional Doors <br />$36,600.00 <br />$8,400.00 <br />$8,400.00 <br />22.95 <br />$28,200.00 <br />08500 <br />Windows <br />$25,000.00 <br />$5,560.00 <br />$5,560.00 <br />22.24 <br />$19,440.00 <br />08800 <br />Steel Studs/Gypsum <br />$22,869.00 <br />$3,500.00 <br />$3,500.00 <br />15.30 <br />$19,369.00 <br />09310 <br />CeramielResilient Tile <br />$30,000.00 <br />$12,000.00 <br />$12,000.00 <br />40.00 <br />$18,000.00 <br />09610 <br />Acoustical Ceiling <br />$6,500.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$6,500.00 <br />09900 <br />Painting <br />$373,921.00 <br />$314,500.00 <br />$10,000.00 $324,500.00 <br />86.78 <br />$49,421.00 <br />10110 <br />Marker BoardslToilet Compartmentsfroilet Accessories <br />10110.1 <br />-Purchase <br />$8,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$8,000.00 <br />10110.2 <br />-Install <br />$3,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,000.00 <br />10250 <br />Safety Devices <br />10250.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />10250.2 <br />-Install <br />$3,500.00 <br />$0.00 <br />$0.00 <br />0-00 <br />$3,500-00 <br />10505 <br />Metal Lockers <br />10505.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0,00 <br />$10,000.00 <br />Page 4 of 7 <br />