Laserfiche WebLink
T <br /> • <br /> 1P ,s h J ` r $� 1 <br /> : gy, ..tn ri,fir.. <br /> 4, <br /> t ,7 I� <br /> " ,�. .t:',t .f _ ,( <br /> o. <br /> , <br /> fi <br /> :' . <br /> Z , <br /> Choke points are a slight narrowing that add challenge and control speed. (Truckee,California) <br /> I <br /> staggered on either side of the trail that serve as physi- choke or tight chicane in an otherwise fast and open <br /> It <br /> cal and visual barriers to keep visitors on the trail. section of trail. Speed-control features like choke <br /> Anchoring—also called corralling—helps emphasize points must be gradual and predictable, and users <br /> turns,prevent trail widening,prevent shortcutting,and must be able to see the choke ahead on the trail prior <br /> adds challenge by keeping the trail narrow. Anchors to encountering it. <br /> such as large ominous "gargoyle" rocks are especially <br /> important on technical trails where users may skirt Modify the Surface Texture <br /> obstacles and widen the trail if allowed. The texture of the trail surface plays a big role in a <br /> trail's difficulty and speed. A trail with lots of tex- <br /> Install Choke Points ture—rocks, roots, and other rough surfaces—pro- <br /> Create a slight narrowing of the trail with rocks or vides a desirable challenge that can require lots of <br /> vegetation to add challenge and control speed. These skill.When used strategically,rough surfaces also help <br /> gateways can be installed just prior to spots in the trail reduce absolute speed while maintaining a sensation <br /> where riders will need to slow down, such as sharp of relative speed, a useful method to manage users. <br /> turns and obstacles.Chokes encourage riders to grad- Surface texture can be manipulated by the trail- <br /> ually apply their brakes well in advance of sensitive builder, and can be tuned to nearly any situation. <br /> areas. Make sure the narrowing flows naturally with One common texturing technique is to use both <br /> the trail—it would be a mistake to install a dramatic naturally occurring and strategically placed rocks in <br /> 235 <br /> Q CHAPTER TEN: Providing Challenging Trails <br /> K • <br />