Laserfiche WebLink
EXHIBIT C <br /> CEPS PLAN ITEM DOCUMENT <br /> (FOR INTERNAL BNSF RAILWAY USE ONLY) <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> LOCATION: ELK RIVER LINE SEGMENT: 25 AFE NUMBER <br /> PLANITEM NUMBER: 000267008 MILEPOST: 38.67 RFA NUMBER <br /> PROPERTY OF: BNSF RAILWAY COMPANY DIVISION: TC CPAR NUMBER: <br /> OPERATED BY: BNSF RAILWAY COMPANY SUBDIVISION: STAPLES BUDGET YEAR: 2016 <br /> JOINT FACILITY: MNDOT ENGR.DIVISION: TWIN CIT EAST BUDGET CLASS: 10 <br /> BILLABLE(+/-): 100.0 TAX STATE: MN,CO:SHERBURNE REPORTING OFFICE: 465 <br /> REQUESTOR ID: S472 MATT,DATE: SPONSOR: VP ENGINEERING <br /> PROJECT TYPE: SPP LOCATION CODE: 691163 DEPT CODE: MOWGH <br /> DOT NUMBER: 082944R TRACK TYPE: 1 DERAILMENT CODE <br /> STIMULUS FUND TYPE: FHWA STIMULUS STATUS: BUY AMERICAN <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> PURPOSE,JUSTIFICATION AND DESCRIPTION <br /> JACKSON AVE-ELK RIVER,MN;INSTALL CONSTANT WARNING/FLASHERS/GATES;TWIN CITIES DIV;STAPLES SUBDIV;LS 0025;MP <br /> 38.67;DOT#082944R. SEQ.#57442. <br /> MONTHLY POWER UTILITY COST CENTER:61740. <br /> THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTATIVE PACKAGES USED FOR ESTIMATING PURPOSES ONLY. <br /> THIS ESTIMATE IS GOOD FOR 90 DAYS.THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR,MATERIAL,AND <br /> OVERHEAD. <br /> CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. <br /> *******************************SIGNAL WORK ONLY******************************* <br /> MNDOT IS FUNDING 100%OF THIS PROJECT. <br /> PROJECT MUST BE DONE IN CONJUNCTION WITH SEQ 57443. <br /> MAINTAIN PROPRIETARY CONFIDENTIALITY. <br /> PRIMARY FUNDING SOURCE IS FHWA <br /> **BUY AMERICA(N)APPLIES** <br /> CASH CAPITAL NONCASH CAPITAL OPERATING EXP REMOVAL COSTS BILLABLE TOTALS <br /> LABOR COSTS 0 0 0 0 185,902 185,902 <br /> MATERIAL COSTS 0 0 0 0 384,818 384,818 <br /> OTHER COSTS 0 0 0 0 194,448 194,448 <br /> TOTALS 0 0 0 0 765,168 765,168 <br /> SYSTEM MAINTENANCE AND PLANNING PRINTED ON: 02/09/2016 <br /> ESTIMATE REF.NUMBER: 000267008-4--2S ESTIMATED BY: KANT <br /> COSTING DATE: 01/01/2016 PRINTED BY: KANT <br /> Page 1 of 5 <br />