Laserfiche WebLink
EXHIBIT C <br /> GATE MECHANISM,S-60 4.0 EA N 24,064 <br /> GENERATOR,ACG-3 2.0 EA N 666 <br /> HAWK 48 DIM 1.0 EA N 1,425 <br /> LED GATE LIGHT KIT 4.0 EA N 744 <br /> LED LIGHT 8.0 EA N 1,608 <br /> LIGHT OUT DETECTOR 2.0 EA N 2,046 <br /> RADARPACKAGE 1.0 LS N 75,000 <br /> RELAY,DAX 8.0 EA N 8,000 <br /> RELAY,GATE DOWN 1.0 EA N 1,000 <br /> RELAY,ISLAND 1.0 EA N 1,000 <br /> SHUNT,NBS (WITH ENCLOSURE) 4.0 EA N 4,324 <br /> SIGN,2 TRACKS 2.0 EA N 62 <br /> SURFACE ROCK 10.0 CY N 500 <br /> TELLULAR DEVICE(RTU) 1.0 EA N 3,052 <br /> TOWER,20 FT 2.0 EA N 5,116 <br /> TOWER,FOUNDATION 2.0 EA N 1,576 <br /> X REM HSE-ARRESTOR,MDSA-2 XS 1.0 EA N 750 <br /> X REM HSE-BATTERY,18 VGL-350 1.0 LS N 5,634 <br /> X REM HSE-BUNGALOW 6X6 1.0 LS N 6,456 <br /> X REM HSE-BUNGALOW MATERIAL 1.0 LS N 7,130 <br /> X REM HSE-CABLE,2C/6 TW 500.0 FT N 580 <br /> X REM HSE-CABLE,3C/2 500.0 FT N 2,760 <br /> X REM HSE-CABLE,7C/14 2000.0 FT N 3,380 <br /> X REM HSE-CHARGERS,12/20 2.0 EA N 698 <br /> X REM HSE-CONDUIT,PVC 4", SCH 80 150.0 FT N 506 <br /> X REM HSE-CONSTANT WARNING,XP4,2TK 1.0 EA N 28,714 <br /> X REM HSE-CONVERTOR,10-10 6.0 EA N 1,188 <br /> X REM HSE-FIELD MATERIAL 1.0 LS N 4,530 <br /> X REM HSE-FILL DIRT 50.0 CY N 1,250 <br /> X REM HSE-FILTER,TRACK 8.0 EA N 2,048 <br /> X REM HSE-GENERATOR,ACG-3 2.0 EA N 666 <br /> X REM HSE-RELAY,DAX 6.0 EA N 6,000 <br /> X REM HSE-SURFACE ROCK 50.0 CY N 2,500 <br /> Y EC5 REPEATER-BATTERY,VGL-420 10.0 EA N 3,660 <br /> Y EC5 REPEATER-BUNGALOW 6X6 1.0 EA N 6,456 <br /> Y EC5 REPEATER-BUNGALOW MATERIAL 1.0 EA N 10,969 <br /> Y EC5 REPEATER-CABLE,2C/6 TW 500.0 FT N 580 <br /> Y EC5 REPEATER-CABLE,3C/2 250.0 FT N 1,380 <br /> Y EC5 REPEATER-CABLE,5C/10 250.0 FT N 460 <br /> Y EC5 REPEATER-CHARGER,12/40 1.0 EA N 499 <br /> Y EC5 REPEATER-EC5 1.0 EA N 14,911 <br /> Y EC5 REPEATER-FIELD MATERIAL 1.0 EA N 6,535 <br /> Y EC5 REPEATER-FILL DIRT 50.0 CY N 1,250 <br /> Y EC5 REPEATER-SURFACE ROCK 50.0 CY N 2,500 <br /> Z MP 38.02-RELAY,DAX 2.0 EA N 2,000 <br /> MATERIAL HANDLING 477 <br /> ONLINE TRANSPORTATION 1 <br /> USE TAX 38,260 <br /> OFFLINE TRANSPORTATION 6,232 <br /> TOTAL MATERIAL COST 551,542 551,542 <br /> OTHER <br /> AC POWER SERVICE 3.0 EA N 30,000 <br /> CONTRACT ENGINEERING 1.0 LS N 48,000 <br /> CONTRACT LABOR 520.0 MH N 65,000 <br /> DIRECTIONAL BORING 350.0 FT N 17,500 <br /> TOTAL OTHER ITEMS COST 160,500 160,500 <br /> PROJECT SUBTOTAL 1,038,264 <br /> CONTINGENCIES 103,710 <br /> BILL PREPARATION FEE 11,420 <br /> GROSS PROJECT COST 1,153,394 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 1,153,394 <br /> Page 6 of 6 <br />