EXHIBIT C
<br /> GATE MECHANISM,S-60 4.0 EA N 24,064
<br /> GENERATOR,ACG-3 2.0 EA N 666
<br /> HAWK 48 DIM 1.0 EA N 1,425
<br /> LED GATE LIGHT KIT 4.0 EA N 744
<br /> LED LIGHT 8.0 EA N 1,608
<br /> LIGHT OUT DETECTOR 2.0 EA N 2,046
<br /> RADARPACKAGE 1.0 LS N 75,000
<br /> RELAY,DAX 8.0 EA N 8,000
<br /> RELAY,GATE DOWN 1.0 EA N 1,000
<br /> RELAY,ISLAND 1.0 EA N 1,000
<br /> SHUNT,NBS (WITH ENCLOSURE) 4.0 EA N 4,324
<br /> SIGN,2 TRACKS 2.0 EA N 62
<br /> SURFACE ROCK 10.0 CY N 500
<br /> TELLULAR DEVICE(RTU) 1.0 EA N 3,052
<br /> TOWER,20 FT 2.0 EA N 5,116
<br /> TOWER,FOUNDATION 2.0 EA N 1,576
<br /> X REM HSE-ARRESTOR,MDSA-2 XS 1.0 EA N 750
<br /> X REM HSE-BATTERY,18 VGL-350 1.0 LS N 5,634
<br /> X REM HSE-BUNGALOW 6X6 1.0 LS N 6,456
<br /> X REM HSE-BUNGALOW MATERIAL 1.0 LS N 7,130
<br /> X REM HSE-CABLE,2C/6 TW 500.0 FT N 580
<br /> X REM HSE-CABLE,3C/2 500.0 FT N 2,760
<br /> X REM HSE-CABLE,7C/14 2000.0 FT N 3,380
<br /> X REM HSE-CHARGERS,12/20 2.0 EA N 698
<br /> X REM HSE-CONDUIT,PVC 4", SCH 80 150.0 FT N 506
<br /> X REM HSE-CONSTANT WARNING,XP4,2TK 1.0 EA N 28,714
<br /> X REM HSE-CONVERTOR,10-10 6.0 EA N 1,188
<br /> X REM HSE-FIELD MATERIAL 1.0 LS N 4,530
<br /> X REM HSE-FILL DIRT 50.0 CY N 1,250
<br /> X REM HSE-FILTER,TRACK 8.0 EA N 2,048
<br /> X REM HSE-GENERATOR,ACG-3 2.0 EA N 666
<br /> X REM HSE-RELAY,DAX 6.0 EA N 6,000
<br /> X REM HSE-SURFACE ROCK 50.0 CY N 2,500
<br /> Y EC5 REPEATER-BATTERY,VGL-420 10.0 EA N 3,660
<br /> Y EC5 REPEATER-BUNGALOW 6X6 1.0 EA N 6,456
<br /> Y EC5 REPEATER-BUNGALOW MATERIAL 1.0 EA N 10,969
<br /> Y EC5 REPEATER-CABLE,2C/6 TW 500.0 FT N 580
<br /> Y EC5 REPEATER-CABLE,3C/2 250.0 FT N 1,380
<br /> Y EC5 REPEATER-CABLE,5C/10 250.0 FT N 460
<br /> Y EC5 REPEATER-CHARGER,12/40 1.0 EA N 499
<br /> Y EC5 REPEATER-EC5 1.0 EA N 14,911
<br /> Y EC5 REPEATER-FIELD MATERIAL 1.0 EA N 6,535
<br /> Y EC5 REPEATER-FILL DIRT 50.0 CY N 1,250
<br /> Y EC5 REPEATER-SURFACE ROCK 50.0 CY N 2,500
<br /> Z MP 38.02-RELAY,DAX 2.0 EA N 2,000
<br /> MATERIAL HANDLING 477
<br /> ONLINE TRANSPORTATION 1
<br /> USE TAX 38,260
<br /> OFFLINE TRANSPORTATION 6,232
<br /> TOTAL MATERIAL COST 551,542 551,542
<br /> OTHER
<br /> AC POWER SERVICE 3.0 EA N 30,000
<br /> CONTRACT ENGINEERING 1.0 LS N 48,000
<br /> CONTRACT LABOR 520.0 MH N 65,000
<br /> DIRECTIONAL BORING 350.0 FT N 17,500
<br /> TOTAL OTHER ITEMS COST 160,500 160,500
<br /> PROJECT SUBTOTAL 1,038,264
<br /> CONTINGENCIES 103,710
<br /> BILL PREPARATION FEE 11,420
<br /> GROSS PROJECT COST 1,153,394
<br /> LESS COST PAID BY BNSF 0
<br /> TOTAL BILLABLE COST 1,153,394
<br /> Page 6 of 6
<br />
|