Laserfiche WebLink
of the street —all of which might encourage some through-traffic to use Pine <br /> Street. . <br /> River Street, in this plan, is a street that develops much like Walnut Street. It IIII <br /> will be a two-lane roadway with parallel parking at each side of the street, with <br /> streetscape amenities added to match those found at Walnut Street. The impor- <br /> tance of parallel parking on.River Street (and on Walnut Street north of River <br /> Street) cannot be overstated: beyond serving the adjacent and nearby busi- <br /> nesses, this parking will serve the parks (allowing all of the limited space in <br /> West Bridge Park to be used for people). <br /> 4„.. .dift_-.3.,iip.,• 1. _ 1,i -. <br /> s.:7•-14r <br /> • <br /> ,. it ? '1 �[,j 2 -.:•-;1411: ::::-". .f Olt _AM: <br /> 7f- :.l,i� •�%-;- <br /> _.. f ,1 ..+r _`r�+c .N■cFtQ �■t� ♦t <br /> 40, <br /> Its <br /> - .-r I ,:,::.s3+ i %•�..4 . .:4179"11112' <br /> 9 Bag 1.�. <br /> 1 r�...-1 .) Writ; <br /> 11 <br /> F. .„.^",,. i 1. <br /> • <br /> i I <br /> , ..,, v--. c r..,---fc.. -,- - . <br /> . ^ci- 1....,c_ T„, .... <br /> w.,..;,: c.,....;;t..... <br /> r+ • r <br /> i r'�. . ' 1 c7�1_�'/ r1 f j�.r_ <br /> 1 <br /> r .-'J' , y, — —Hen.-. <br /> f'*"rn Y..*► :own p1.AZWW W.I. :.y.+ <br /> River Street provides a great focus on Bridge Park and surrounding development,and the character of the street might <br /> become more like Walnut Street–creating a unified street pattern where the new"main street"meets the river and park <br /> Cross streets (Third Street, Fourth Street and Sixth Street) are those that con- <br /> nect Pine Street to Walnut Street and allow for local traffic to reach the new <br /> main street. In character, they feel more like Walnut Street than Pine Street; in <br /> function, they are two-lane roadways with parallel parking. Where needed, <br /> left turn lanes are added to facilitate traffic movements. <br /> Seventh Street is similar to the cross streets, except that it will have extended <br /> turn lanes in each direction that will preclude on-street parking. In terms of <br /> II) <br /> traffic management, Seventh Street complements Broadway by providing for a <br /> higher traffic volume roadway at each end of the core of Walnut Street. <br /> "I A New Bridge <br /> ':. Revitalizing Monticello's Downtown and Rive:front <br /> Page 3:24 <br />