My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 07-06-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
07-06-2015
>
8.2. SR 07-06-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2015 4:08:42 PM
Creation date
7/1/2015 3:46:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Proposals <br /> Rivers Edge Commons Park Expansion Phase One Page 3 of 7 <br /> -------------------------- <br /> Section 3 Overall Scope of Services <br /> The services required of the Consultant are anticipated to be provided beginning in July of 2015 and <br /> ending after final acceptance of the improvements and expiration of the warranty period,whichever <br /> comes later. The selected Consultant shall be the overall project lead and manager on behalf of the <br /> City. The Consultant shall report to and take direction from city staff as directed by the City <br /> Council. <br /> The Consultant's proposal should include a detailed scope and budget estimate for all services as <br /> outlined in this RFP. Each element must be broken out as a separate item. <br /> The City stresses Consultant's innovation,uniqueness and ingenuity in proposing scope of services. <br /> Recommended changes to the scope will be considered and concerns regarding budget and time <br /> frames should also be identified. <br /> The City proposes a team approach in the development of the design utilizing the services of the <br /> Consultant in conjunction with the Parks and Recreation staff and the Parks and Recreation <br /> Commission. <br /> Management Services <br /> The Consultant will serve as assistant to the Parks and Recreation Director throughout all elements <br /> of the park design project. Services rendered shall include as a minimum: <br /> 1. Assistance in defining the maximum utilization of project resources in completing the scope <br /> of services,taking into account budget and time frame constraints. <br /> 2. Coordination,preparation and delivery of monthly reports covering the project. Meeting <br /> with the Parks and Recreation Director on a regular basis. <br /> 3. Assistance in preparing documents, CAD,graphics and mapping standards applicable to all. <br /> Parks Design and Construction Drawings <br /> The Consultant shall: <br /> 1. Include a topographic and boundary survey for the Phase One of the Rivers Edge <br /> Commons Park Project. <br /> 2. Define materials and construction systems for this project. <br /> 3. Design drainage system to incorporate storm sewers and catch basins. <br /> 4. Design and engineer retaining walls that will reinforce the upper parking lot and fit within <br /> the overall design of the park. <br /> 5. Develop outline specifications for the scope of this project. <br /> 6. Reviews draft and final design development sets with city staff and the Parks and Recreation <br /> Commission. <br /> 7. Drawings must include all details, cross section and profiles necessary to bid the project. <br /> 8. Review 60% and 90% construction document sets with city staff. <br /> C:\Users\rgardner\Desktop\Park RFP\FINAL RFP Rivers Edge Commons Park Phase One.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.