My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Work Plan 7 <br /> ❑ Comment on finishes from carpet to epoxy flooring. ADDITIONAL SERVICES <br /> ❑ Comment on access and circulation in and around the <br /> These are services which ERMU may wish to consider if <br /> building. <br /> needed or desired. <br /> ❑ Comment on the site layout and whether it meets the <br /> functional needs of Elk River Municipal Utilities. ❑ Full Site Survey:if one does not exist,TKDA has in-house <br /> ❑ TKDA will then revise the site and building plans and will staff to assist ERMU in developing a full Meets and <br /> incorporate the comments. Bounds,topographic and utility Survey for use in the <br /> project and for future use of the Utility.Cost:$10,000.00 <br /> TASK 10 • PMT Meeting #4 ❑ Additional Presentations or meetings with the Board of <br /> Review the conceptual plans as revised after the Group Commissioners: We encourage the Board to sit in on the <br /> meetings and the incorporation of all input. PMT meetings as an informational effort.The fee is for <br /> additional meetings with the Board not currently in the <br /> TASK 11 • Project Cost Budget Work Scope and includes preparation and travel time. <br /> Cost:$2,000.00 <br /> The Project estimating will be in two parts.One part will cover LEED Guidelines: Along with the conceptual plans and <br /> design services including construction documents,assistance estimating,we can add in the costs of any additional <br /> in bidding and construction administration.The second part <br /> LEED related items if LEED certification is a desired <br /> will estimate the construction including permitting,site <br /> project goal. <br /> development, building construction,and furniture,fixtures, <br /> and equipment.This will be done using standardized cost " "Green" Initiatives:In addition to the conceptual plan,we <br /> estimating systems. It will be separated into the three options. will introduce certain"Green"initiatives that make sense <br /> for the conceptual site and building plan. This includes <br /> ❑ Full Service Center with Administration, Billing and looking at Geo-thermal heating and cooling,solar <br /> Customer Service. photovoltaic,"Earth Tubes"for heating and cooling,a <br /> ❑ Service Center without Administration,Billing and mini-hydro-generator to supply the site,the use of solar <br /> Customer Service. shading and roofing system. Each initiative will have an <br /> ❑ Separate Administration, Billing and Customer Service implementation cost included in the write up. <br /> renovations at the City Center site. Cost:$2,500.00 each <br /> ❑ The estimating will include phasing of construction on the <br /> site. <br /> TASK 12 • PMT Meeting #5 <br /> Review the estimates with the PMT. <br /> TASK 13 • Final Report and PMT Meeting #6 <br /> TKDA will prepare a final Conceptual Master Plan report <br /> documenting all of the above tasks.The report will include a <br /> schedule of implementation based on a project starting in <br /> early 2016. It will be presented to the PMT in both hard and <br /> electronic media. <br /> TASK 14 • Presentation to the Board of <br /> • <br /> Commisioners <br /> TKDA will prepare a power point presentation illustrating the <br /> process and the findings resulting in a conceptual site plan, <br /> conceptual building plan and estimate. <br /> 6 <br /> City of Elk River I Municipal Utilities Building Study <br /> 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.