Laserfiche WebLink
Detailed Work Plan 7 <br /> ❑ The completed questionnaires will be returned to the ❑ Site Base Plan: ERMU will provide a paper and electronic <br /> groups for their review and approval. survey of the downtown site and other sites to include the <br /> following: meets and bounds,topography,above and <br /> TASK 5 • Needs Analysis below grade site utilities,buildings,concrete pads and <br /> ❑ Site Reviews and analysis.Review downtown and other existing structures.See Additional Services for for survey. <br /> sites. ❑ Conceptual Site Plan:Using the base plan provided by Elk <br /> » Note problems with topography,street access,zoning, River Utilities,TKDA will prepare a Conceptual Site plan <br /> potential for material storage. showing existing conditions, new buildings and new <br /> Phasing. paving including parking lots,outside storage areas, <br /> » delivery areas,traffic flow and security. <br /> » Potential for material storage at remote sites. ❑ Conceptual Building Plan:TKDA will prepare a conceptual <br /> ❑ Space Programming:The information gained in Task#4 building plan that will delineate each group's spaces based <br /> will be the basis of the space programming.The on the Needs Assessment It will include: <br /> questionnaires will be part of the documentation.The » The conceptual design will plan on the Administration, <br /> Space Program itself will: Customer Service and Billing as part of the building and <br /> » List the square foot requirements. as a phasing option to have the Administration, <br /> » List all needs that are documented in the revised Customer Service and Billing added at a later date. <br /> questionnaire and the meeting minutes. 1. Office layout with closed and open office areas laid <br /> » List phasing issues-cause and effect. out. <br /> ❑ TKDA will do a review of the Elk River City Zoning Code 1. Office remodeling for Administration,Customer <br /> and provide a listing of pertinent sections and information Service and Billing at the office space at the City <br /> as they relate to the downtown site. Center. <br /> ❑ TKDA will do a review of the IBC(International Building » Shops laid out without equipment. <br /> Code)and Minnesota amendments for specific » One building section and four elevations. <br /> requirements as they pertain to the shops areas.General <br /> requirements such as exiting and fire separation will be TASK 8 • PMT Meeting #3 <br /> incorporated into the plans as necessary. PMT Meeting#3 will review the conceptual designs and gain <br /> ❑ The Needs Analysis will provide a report that documents input prior to the second round of Group Meetings. <br /> each group's needs. <br /> TASK 9 • Group Meetings #2 <br /> TASK 6 • PMT Meeting #2 When the conceptual plans are completed,TKDA will have <br /> ❑ The revised Questionnaire will be returned to TKDA. another set of meetings with PMT and each group to review <br /> ❑ The Needs Analysis will be submitted for review and a the site and building layouts.The meetings will be done using <br /> meeting held with the PMT to go over the document. a laptop computer and projector so that the Design and Staff <br /> ❑ Discussion on Site issues: Team can place things and move things around in real-time. <br /> » Utilities crossing site. Each group will be allocated 2 hours for these meetings. It is <br /> » Sub-station on site. during this set of meetings that the input of designated staff <br /> » Private access across site. will be of great importance and give them ownership. <br /> » Additional site acquisition. ❑ Each group will be asked to help us organize their space <br /> ❑ Discussion on Phasing. —be it cubes and copiers or equipment or storage racking <br /> —using the information gained during Task#3 and working <br /> TASK 7 • Conceptual Design on the computer together. <br /> ❑ Each group will be asked where they would like the <br /> Site and Building: Using the information garnered from Task objects currently in their space to be placed. <br /> #5 and#6,TKDA will prepare a Conceptual Site plan and a ❑ Comment on lighting/daylighting requirements. <br /> Conceptual building plan. <br /> City of Elk River I Municipal Utilities Building Study <br /> 149 <br />