Laserfiche WebLink
Statement of Deliverables 1 <br /> ❑ Meeting Agendas and Meeting Minutes <br /> ❑ Meeting support materials:drawings <br /> ❑ Completed Questionnaire <br /> ❑ Draft and Final Needs Assessment <br /> » Full operational Service Center <br /> » Zoning and Building Code review for Conceptual plans <br /> ❑ Site Master Plan <br /> » Phasing <br /> » Other site storage <br /> » Zoning requirements <br /> ❑ Conceptual Design of facility plans,sections,and <br /> elevations <br /> » Phased approach <br /> » Fully operational Service Center <br /> » A 3-D rendering of the site and building are an optional <br /> additional service <br /> ❑ Square Foot Cost Estimating-Published costs and <br /> experience based costs <br /> » Fullly operational Service(including furniture,fixtures, <br /> and equipment) <br /> » Phasing <br /> ❑ Final Report in both printed media and electronic format <br /> City of Elk River I Municipal Utilities Building Study <br /> 151 <br />